PROPOSED CAPITAL IMPROVEMENTS
-
- The following list
of proposed capital improvements and general maintenance projects
is compiled as of March 15, 2001. It includes projects under
construction which are expected to be completed in 2001 and projects
that will begin construction during 2001, unless otherwise specified.
BRIDGES
- Federal
Funds
-
- Contract
2000-704 -- One Bridge Replacement
- Mill Road Bridge #01.212
- Contract amount:
$339,045
- Photo:
Existing bridge.
-
- Contract
2000-705 LPA -- One Bridge Replacement
- Okeana Drewersburg
Road Bridge #02.366
- Contract amount:
$981,790
- Photo: Existing bridge.
-
- Contract
2000-703 LPA -- One Bridge Replacement
- Ross Hanover Road
Bridge #00.242
- Contract amount:
$439,067
- Photo: Existing bridge.
-
- Contract
for One Bridge Replacement
- California Road Bridge
#04.312
- Estimated total
project cost: $2,350,000
- Photo:
Existing bridge.
-
- Contract
for One Bridge Replacement
- Taylor School Road
Bridge #03.461
- Estimated total
project cost: $1,000,000
- Photo: Existing bridge.
-
- Major
Bridge Replacements in Design and Engineering Phase
- Fairfield Road Bridge
#00.045 -- Replacement 2003
- Estimated total
project cost: $1,050,000
- Photo: Existing bridge.
-
- Liberty Fairfield
Road Bridge #03.803 -- Replacement 2003
- Estimated total
project cost: $12,300,000
- Photo:
Existing bridge.
-
- Local
Funds By Contract
-
- Contract
2000-9 -- Bridge Deck Replacement
- Elk Creek Road Bridge
#05.004
- Contract amount:
$162,784.25
- Photo:
Existing bridge.
-
- Contract
for New Bridge Installation
- Salman Road Bridge
#00.010
- Estimated total
project cost: $56,000
-
- Local
Funds By Force Account
-
- Bridge
Deck Replacement and Structural Repairs
- Allen Road Bridge
#00.697
- Cincinnati Dayton
Road Bridge #07.007
- Howard Road Bridge
#01.640
- South Weaver Road
Bridge #00.657
- Estimated total
project cost: $80,000
-
- New
Bridge Preparation - Abutments
- Salman Road Bridge
#00.010
- Estimated cost: $40,000
-
- CULVERTS
-
- Local
Funds By Force Account
-
- Culvert
Replacements
- Cox Road Culvert #01.093
- Kyles Station Road
Culvert #00.733
- Millikin Road Culvert
#04.157
- North B Street Culvert
#02.408
- North B Street Culvert
#02.594
- Estimated total
project cost: $55,300
-
- Culvert
Rehabilitation
- Liberty Fairfield
Road Culvert #01.532
- Estimated project
cost: $26,094
-
- Township
Culvert Replacements
- Bethany Road Culvert
#00.069
- Dunwoody Road Culvert
#02.581
- Georgetown Road Culvert
#00.124
- Imhoff Road Culvert
#01.642
- Mauds Hughes Road
Culvert #01.004
- Morman Road Culvert
#03.472
- Neanover Road Culvert
#00.107
- Taylor Road Culvert
#00.229
- Warvel Road Culvert
#00.549
- Estimated total
project cost: $110,000
- (Additional funding
from the Townships)
INTERSECTION
IMPROVEMENTS
- Federal
Funds
-
- Intersection
Improvement in Design and Engineering Phase
- Liberty Fairfield
Road at Princeton Road -- Construction 2002
- Estimated total
project cost: $775,000
- Photo:
View of intersection looking west on Princeton Road.
-
- State
Issue 2 Funds
-
- Contract
for One Intersection Improvement
- Wayne Madison Road
at Ohio 73
- Estimated total
project cost: $600,000
- (Additional funding:
City of Trenton and St. Clair Twp)
-
- Community
Development Block Grant Funds
-
- Contract
for One Intersection Improvement
- West Alexandria Road
at Elk Creek Road
- Estimated total
project cost: $175,000
- Photo:
View of intersection from West Alexandria Road.
-
- Local
Funds By Contract
-
- Two
Intersection Improvements
- Butler Warren Road
at Hamilton Mason Road
- Butler Warren Road
at Bethany Road
- BCEO share: $334,047
- Total project
cost: $815,000
- (Construction cost
shared by BCEO and Warren County. BCEO to provide design for
Butler Warren at Bethany.)
-
- Contract
for Installation of Flashing Signal
- Stillwell Beckett
Road at Ohio 732
- Estimated total
project cost: $8,000
ROADWAY
IMPROVEMENTS
- Federal
Funds
-
- Contract
for One Roadway Improvement
- Cincinnati Dayton
Road from Mauds Hughes Road to I-75 -- Widen to five lanes; upgrade
I-75 interchange and bridge
- Contract amount:
$11,946,378.39
- (Contract awarded
by ODOT. Additional funding: State Issue 2)
- Photo:
Cincinnati Dayton Road in West Chester Township will be widened
from two to five lanes.
- Photo:
The project will also improve the Cincinnati Dayton Road / Tylersville
Road intersection.
- Photo:
The bridge over I-75 will be widened and the entrance and exit
ramps improved.
-
- Major
Roadway Improvements in Design and Engineering Phase
- Cincinnati Dayton
Rd. improvement from Ohio 129 to Millikin Rd. -- Construction
2002
- Estimated total
project cost: $2,937,000
-
- Ohio 747 from Smith
Rd. to Tylersville Rd. - Widen to five lanes -- Construction
2003
- Estimated total
project cost: $7,000,000
- (Project in conjunction
with TID.)
-
- Ohio 63 Extension
from Ohio 4 to U.S. 127 -- Construction 2005
- Estimated total
project cost: $80,000,000
- More
info about this project.
-
- State
Issue 2 Funds
-
- Contract
for One Roadway Improvement
- Morgan Ross Road from
Hamilton New London Road to Hamilton County line
- Estimated total
project cost: $209,000
-
- Major
Roadway Improvements in Design and Engineering Phase
- Port Union Rd. from
Ohio 747 to Fairfield corp. - Widen to four lanes -- Construction
2002
- Estimated total
project cost: $2,000,000
-
- Muhlhauser Road from
Ohio 4 to Ohio 747 - Widen to five lanes and upgrade of Mack/Muhlhauser/Ohio
4 intersection -- Construction 2003
- Estimated total
project cost: $11,652,343
- (Project in conjunction
with City of Fairfield.)
-
- Local
Funds By Contract
-
- Contract
for One Roadway Improvement
- West Chester Road
- Widen from Union Centre Boulevard to I-75 overpass
- Contract amount:
$891,584
- (Funding: TID
and West Chester Twp)
-
- Contract
for One Roadway Improvement
- West Chester Road
- Widen from Beckett Road to Union Centre Boulevard
- Contract amount:
$1,887,479
- (Funding: TID
and West Chester Twp)
-
- Contract
for One Roadway Improvement
- Symmes Road Extension
from Seward Road to Ohio 747
- Contract amount:
$11,946,378
- (Funding: TID,
West Chester Twp, and City of Fairfield)
-
- Contract
for One Roadway Improvement
- Morris Road from Hamilton
Mason Road to Ohio 129
- Estimated total
project cost: $220,282
- (Funding: Fairfield
Twp)
PAVING
- Local
Funds By Contract
-
- Contract
2000-7 -- Resurfacing of Various County and Township Roads in
Hanover, Milford, Oxford, Reily, and Ross Townships
- County roads:
- Contreras Road - Indiana
state line to Oxford corp.
- Layhigh Road - Hamilton
New London Road to Ohio 126
- Township roads:
- Booth Road - CSX Railroad
to Law Road
- Corso Road - Ohio
732 to dead-end
- Dunwoody Road - Hart
Road to Indiana state line
- Frazee Road - U.S.
127 to Neanover Road
- Hart Road - Peoria
Reily Road to CSX Railroad
- Hussey Road - U.S.
27 to dead end
- Huston Road - U.S.
127 to Hamilton Eaton Road
- Neanover Road - Somerville
Road to Frazee Road
- North Weaver Road
- Ohio 129 to Dunwoody Road
- Riggs Road - Brookville
Road to Reily Twp. line
- Taylor Road - Contreras
Road to U.S. 27
- Contract amount:
$840,273.03
-
- Contract
for Resurfacing of County Roads
- Elk Creek Road - Trenton
corp. to Howe Road
- Kyles Station Road
- Ohio 4 to LeSourdsville West Chester Road
- Millikin Road - LeSourdsville
West Chester Road to Mauds Hughes Road
- North B Street - Hamilton
corp. to New Miami corp.
- Estimated total
project cost: $343,000
-
- Resurfacing
of County Roads - Phase 2 (based on available funding)
- Cox Road - U.S. 42
to Barret Road
- Liberty Fairfield
Road - Ohio 129 to Ohio 4
- Morman Road - Stahlheber
Road to Ohio 130
- Seven Mile Avenue
- New Miami corp. to U.S. 127
- Estimated total
project cost: $365,500
-
- OTHER
-
- Community
Development Block Grant Funds
-
- Contract
for Storm Sewer and Drainage Improvements Project
- Milford Township -
Darrtown area, phase 2
- Estimated total
project cost: $200,000
-
- Contract
for Sidewalk Installation
- Ross Township - School
Road & Layhigh Road
- Estimated total
project cost: $87,000
-
- Contract
for Street Resurfacing and Sidewalk Repairs
- Seven Mile, Village
of - Various streets
- Trenton, City of -
Third Street, phase 3
- Estimated total
project cost: $129,000
-
- Local
Funds By Contract
-
- Contract
2000-8 -- Embankment Slip Repair
- Elk Creek Road
- Contract amount:
$203,000
- Photo:
Elk Creek embankment slip.
-
- Centerline
and Edgeline Striping of Various County and Township Roads
- Estimated total
project cost: $100,000
-
- Local
Funds By Force Account
-
- Vegetation
Management - Annual Weed Spray for Guardrail/Broadleaf/Johnson
Grass
- Various County roads
- Contract amount:
$20,000
-
- Various
Township Projects
- Bay Road - Ditching
and drainage improvements
- Tolbert Road - Piping
and ditching
- Estimated total
project cost: $50,000
- (Additional projects
may be added by the Townships after this Report is published.)