1998-99 Annual Report
1998 Review....1999 Preview
 
Letter to Citizens | Butler County Data | Project Development | Funding Sources | 1998 Review |
1998 Income/Expenditures | 1999 Proposed Capital Improvements | 1999 Projected Revenue

1999 PROPOSED CAPITAL IMPROVEMENTS

Click camera for photos throughout Report.

The following list of proposed capital improvements and general maintenance projects is compiled as of March 1, 1999. It includes projects under construction which are expected to be completed in 1999 and projects that will begin construction during 1999, unless otherwise specified.

BRIDGES

    Federal Funds
     
    Indian Creek Road Bridge #00.498 -- Replacement
    Contract amount: $834,811
    Before construction.
     
    LeSourdsville West Chester Road Bridge #07.329 -- Replacement
    Contract amount: $419,133
    Before construction.
     
    Hamilton New London Road Bridge #02.425 -- Replacement
    Estimated total project cost: $425,000
     
    Ross Hanover Road Bridge #00.230 -- Design and engineering; replacement in 2000
    Estimated total project cost: $443,000
     
    Mill Road Bridge #01.212 -- Design and engineering; replacement in 2000
    Estimated total project cost: $360,000
     
    California Road Bridge #04.312 -- Design and engineering; replacement in 2000
    Estimated total project cost: $2,000,000
     
    Okeana Drewersburg Road Bridge #02.366 -- Design and engineering; replacement in 2001
    Estimated total project cost: $670,000
     
    Liberty Fairfield Road Bridge #03.803 -- Design and engineering; replacement in 2001
    Estimated total project cost: $5,000,000
    Existing bridge.
     
    Taylor School Road Bridge #03.461 -- Design and engineering; replacement in 2001
    Estimated total project cost: $850,000
    Existing bridge.
     
    Local Funds By Contract
     
    Contract 1999-1 -- Four Bridge Deck Replacements
    Bonham Road Bridge #00.388
    Myers Road Bridge #00.019
    Scott Road Bridge #00.618
    Tolbert Road Bridge #01.718
    Estimated total project cost: $186,400
     
    Contract 1999-2 -- Three Bridge Deck Replacements
    Cincinnati Dayton Road Bridge #07.007
    Mauds Hughes Road Bridge #01.400
    Millikin Road Bridge #04.435
    Estimated total project cost: $90,000
     
    Contract 1999-4 -- Four Bridge Deck Replacements
    California Road Bridge #02.129
    Gates Road Bridge #00.695
    Morgan Ross Road Bridge #01.106
    Schoenling Road Bridge #00.619
    Estimated total project cost: $93,000
     
    Contract 1999-# -- New bridge
    Millikin Road Bridge over Bypass 4
    Estimated total project cost: $1,000,000
    (Funding: Fairfield Township/TIF)
     
    Local Funds By Force Account
     
    One Bridge Deck Replacement
    Corso Road Bridge #00.123
    Estimated total project cost: $10,000
     
    CULVERTS
     
    Local Funds By Force Account
     
    10 Culvert Replacements
    Hamilton Mason Road Culvert #02.347
    Jacksonburg Road Culvert #07.381
    Layhigh Road Culvert #05.284
    Layhigh Road Culvert #07.711
    Millikin Road Culvert #03.151
    Millikin Road Culvert #06.685
    Morganthaler Road Culvert #01.976
    Waynes Trace Culvert #00.632
    Waynes Trace Culvert #01.523
    West Alexandria Road Culvert #02.160
    Estimated total project cost: $93,000
     
    Township Culvert Replacements
    Belmont Avenue Culvert (no #)
    Butler Warren Road Culvert #04.565
    Browns Run Road Culvert #01.261
    Cochran Road Culvert #00.140
    Cotton Run Road Culvert #02.738
    Depot Road Culvert #00.375
    Dunwoody Road Culvert #00.437
    Dunwoody Road Culvert #03.853
    Dunwoody Road Culvert #03.957
    Gates Road Culvert #00.111
    Gates Road Culvert #00.221
    Gates Road Culvert #00.338
    Gates Road Culvert #00.631
    Gates Road Culvert #00.767
    Harris Road Culvert #00.221
    Harris Road Culvert #01.939
    Huston Road Culvert #00.670
    Layhigh Road Culvert #01.960
    Mauds Hughes Road Culvert #01.138
    Mauds Hughes Road Culvert #01.315
    Morman Road Culvert #03.517
    Paullin Drive Culvert #00.100
    Shollenbarger Road Culvert #00.326
    Taylor Road Culvert #01.325
    Thomas Road Culvert #01.396
    Thomas Road Culvert #02.186
    Estimated total project cost: $100,000
     
    INTERSECTION IMPROVEMENTS
     
    State Issue 2 Funds
     
    Contract 1999-# -- One Intersection Improvement
    Wayne Madison Road at Ohio 73
    Estimated project cost: $600,000
    (Additional funding: City of Trenton)
     
    Local Funds By Contract
     
    Four Intersection Improvements
    Cincinnati Dayton Road at Kyles Station Road
    Eaton Road at Taylor School Road
    Hamilton Mason Road at Ohio 747
    Kyles Station Road at Yankee Road
    Estimated total project cost: $250,000
    Existing Cincinnati Dayton Road at Kyles Station Road.
    Existing Kyles Station Road at Yankee Road.
     
    Contract 1999-# -- Installation of flashing light
    Stillwell Beckett Road at Ohio 732
    Estimated total project cost: $15,000
    (Funding: Oxford Township)
     
    ROADWAY IMPROVEMENTS
     
    Federal Funds
     
    Cincinnati Dayton Road from Mauds Hughes Road to I-75 -- Widen to five lanes; upgrade I-75 interchange and bridge
    Estimated total project cost: $14,000,000
    Cincinnati Dayton Road in Union Township will be widened from two to five lanes.
     
    State Issue 2 Funds
     
    Port Union Road from Ohio 747 to Fairfield corp. -- Widen to four lanes
    Estimated total project cost: $1,800,000
     
    Crescentville Road from Ohio 747 to I-75 -- Widen to five lanes. Design and engineering; construction in 2001
    Estimated total project cost: $2,000,000
    (Cities of Springdale and Sharonville will contribute funds to this project.)
     
    Local Funds By Contract
     
    Contract 1999-4 -- Emergency repairs due to severe winter weather damage
    Millikin Road from Ohio 747 to Yankee Road
    Contract amount: $207,642
     
    Contract 1999-# -- One Roadway Improvement
    Beckett Road - Widen and straighten curve north of Union Centre Boulevard
    Estimated total project cost: $10,820
     
    Contract 1999-# -- One Roadway Improvement
    West Chester Road - Widen from Union Centre Boulevard to I-75 overpass
    Estimated total project cost: $2,000,000
    (Funding: Union Township/TIF)
     
    Contract 1999-# -- Roadway Extension
    Tyler's Place Boulevard from dead-end to Hamilton Mason Road
    Estimated total project cost: $739,000
    (Funding: Union Township/TIF)
     
    Contract 1999-# -- One Roadway Improvement
    Morris Road from Hamilton Mason Road to Butler Regional Highway
    Estimated total project cost: $125,000
    (Funding: Fairfield Township)
     
    Contract 1999-# -- Turn lane addition
    Ohio 128 at Ross High School
    Estimated total project cost: $70,000

PAVING

    All paving contracts will also include the resurfacing of various Township roads
    which will increase the estimated total project cost from the figures listed below.
    This information however was not available from the Townships until after the
    time of this publication.
     
    Local Funds By Contract
     
    Paving of County (and Township) Roads
    16.7 miles of County paving:
    Elk Creek Road - Howe Road to Trenton corp.
    Jacksonburg Road - Jacksonburg corp. to county line
    Layhigh Road - Hamilton New London Road to Ohio 748
    Millikin Road - LeSourdsville West Chester Road to Ohio 747
    Morganthaler Road - Trenton Road to U.S. 127
    Trenton Franklin Road - Ohio 122 to Ohio 4
    Waynes Trace Road - Tolbert Road West to U.S. 127
    Windisch Road - Crescentville Road to Allen Road
    Estimated total cost: $916,243
     
    RAILROAD CROSSINGS
     
    Contract 1999-601 - Garver Elliot Road at CSX Crossing -- Lights and gates; realignment; elimination of nearby crossings at Law and Pierson Roads
    Estimated total project cost: $420,000
    (Funding: Federal, PUCO, CSX, Local)
    Garver Elliot Road / CSX Railroad crossing.
    Law Road / CSX RR crossing to be eliminated.
    Pierson Road / CSX RR crossing to be eliminated.
     
    Hussey Road at CSX Crossing -- Installation of rubberized crossing
    (Funding: CSX)
     
    Morman Road at CSX Crossing -- Installation of rubberized crossing
    (Funding: CSX)
     
    Trenton Franklin Road at CSX Crossing -- Installation of rubberized crossing
    (Funding: CSX)
     
    Wayne Madison Road at CSX Crossing -- Installation of rubberized crossing
    (Funding: CSX)
     
    OTHER
     
    Federal Funds
     
    Guardrail upgrades
    Hamilton Eaton Road
    Estimated project cost: $200,000
     
    Raised pavement markers
    Various County roads
    Estimated project cost: $200,000
     
    Contract 1999-602 - Bike path project
    Cox Road bikeway from Tylersville Road to U.S. 42
    Estimated project cost: $528,000
    (Additional funding: Union Township - engineering; BCEO - administration)
     
    Community Development Block Grant Funds
     
    Contract B-F-97-009--1 -- Six projects
    College Corner, Village of - Various street improvements
    New Miami, Village of - Street resurfacing
    Reily Township - Dunwoody Road improvements
    Seven Mile, Village of - Storm sewer improvements
    Somerville, Village of - Walnut Street drainage improvements
    Trenton, City of - Third Street storm sewer and sidewalk project
    Total project cost: $314,000
     
    Local Funds By Contract
     
    Centerline and edgeline striping of various County and Township Roads
    Estimated project cost: $140,000
     
    Channel protection / Flood prevention
    Race Lane Road
    Warwick Road
    (Funding: County Commissioners)
    Work will be performed along Race Lane Road to prevent flooding and erosion from Dry Run Creek.
     
    Local Funds By Force Account
     
    Retaining Wall Repair
    River Road from Georgetown Road to U.S. 27
    Estimated project cost: $20,000
     
    Annual weed spray for guardrail/Broadleaf/Johnson grass
    Various County roads
    Estimated project cost: $21,000
     
    Drainage improvements
    Morganthaler Road at Jackson Road
    Estimated total project cost: $10,000
     
    Various Township Projects
    Bay Road - Ditching
    Brooks Road - Ditching
    Mauds Hughes Road - Guardrail repair
    Morganthaler Road - Drainage improvements
    Morris Road - Ditching and catch basin installation
    Morris Road at Hamilton Mason Road - Clearing and sight distance
    South Street - Drainage improvements
    Wayne Milford Road - Guardrail repair
    Estimated total project cost: $40,000