- 1999
REVIEW
- Projects
and Activity
Click camera for photos throughout
Report.
Butler County Engineer's
Office employees worked a total of 144,758 hours with an average
of 73 full time employees during 1999. Progressive and cost-efficient
engineering define a BCEO tradition concerned with building a
safer transportation system for Butler County motorists. The
evidence is on the roads you drive. The specifics are outlined
in this Report.
During 1999, the Butler
County Engineer's Office was involved with the completion of
projects totaling $9,628,504, including:
- 15 bridge projects
- 36 culvert projects
- 3 intersection projects
- 2 roadway improvement
projects
- 71.2 miles of paving
- 3 railroad crossing
projects
- 611 miles of striping
- 8 Block Grant projects
The above list does
not include routine activities such as general design and engineering,
commercial and residential development services, tax mapping
services, and day-to-day roadway maintenance such as signing,
mowing, drainage, and snow and ice control. As you can see, the
BCEO is a multi-faceted, full-service agency covering all facets
of road and highway transportation in Butler County.
For a detailed review
of 1999 activity, please read on.
1999
SUBDIVISION DEVELOPMENT IN BUTLER COUNTY
Liberty Township led
Butler County in subdivision development during 1999 for the
second year in a row.
Unincorporated
Areas
|
Township |
New Subdivision
Plats |
New Lots |
Acres Developed |
New Streets |
Miles of New Streets |
|
Fairfield |
11 |
355 |
167.3 |
25 |
3.4 |
|
Hanover |
0 |
0 |
0 |
2 |
0.6 |
|
Lemon |
1 |
39 |
14.2 |
3 |
0.3 |
|
Liberty |
19 |
705 |
417.6 |
54 |
7.9 |
|
Madison |
1 |
2 |
2.5 |
0 |
0 |
|
Milford |
0 |
0 |
0 |
0 |
0 |
|
Morgan |
1 |
3 |
8.1 |
1 |
0.04 |
|
Oxford |
0 |
0 |
0 |
0 |
0 |
|
Reily |
0 |
0 |
0 |
0 |
0 |
|
Ross |
3 |
53 |
193.2 |
4 |
0.7 |
|
St. Clair |
0 |
0 |
0 |
0 |
0 |
|
Wayne |
0 |
0 |
0 |
0 |
0 |
|
West Chester |
7 |
124 |
119.1 |
14 |
2.6 |
|
Total |
43 |
1,281 |
922 |
103 |
15.5 |
Incorporated
Areas
|
Township |
New Subdivision
Plats |
New Lots |
Acres Developed |
New Streets |
Miles of New Streets |
|
College Corner |
0 |
0 |
0 |
0 |
0 |
|
Fairfield |
7 |
143 |
163.5 |
14 |
1.4 |
|
Hamilton |
9 |
94 |
359.9 |
13 |
1.9 |
|
Jacksonburg |
0 |
0 |
0 |
0 |
0 |
|
Middletown |
2 |
22 |
8.4 |
2 |
0.2 |
|
Millville |
0 |
0 |
0 |
0 |
0 |
|
Monroe |
12 |
277 |
161.5 |
21 |
2.7 |
|
New Miami |
0 |
0 |
0 |
0 |
0 |
|
Oxford |
6 |
49 |
25.2 |
5 |
0.6 |
|
Seven Mile |
0 |
0 |
0 |
0 |
0 |
|
Sharonville |
0 |
0 |
0 |
0 |
0 |
|
Somerville |
0 |
0 |
0 |
0 |
0 |
|
Trenton |
3 |
87 |
178.5 |
7 |
0.5 |
|
Total |
39 |
672 |
897 |
62 |
7.3 |
TAX
MAP SUMMARY
|
Activity |
1999 |
1998 |
|
Sale of Plats |
$16,506.30 |
$15,006.25 |
|
Transfers |
19,212 |
17,216 |
|
Parcel Splits |
416 |
384 |
|
Survey Plats Recorded |
395 |
466 |
|
House #s Assigned |
1,165 |
637 |
|
House #s Verified |
1,122 |
1,236 |
|
Bonds Recorded |
19 |
5 |
|
Annexations Recorded |
3 |
1 |
|
Annexations Checked |
3 |
1 |
1999
Projects
This section includes
a comprehensive listing of all projects that were completed during
the 1999 construction year.
BRIDGES
The Butler County Engineer's
Office performs an annual inspection of all bridges on County
and Township roads. Some bridges receive inspection two or more
times per year due to their worsened condition. The BCEO had
inspection and maintenance responsibility for 369 bridges (structures
with a clear span of ten feet or greater) at the beginning of
1999. That number remained unchanged at the end of the year.
There are 34 bridges
located on State highways within municipalities for which the
State of Ohio has inspection responsibility but the County Engineer
has maintenance responsibility.
Fourteen bridges were
posted with load limit restrictions at the end of 1999. This
is down from over 40 load-restricted bridges just five years
ago. The County Engineer's aggressive bridge program is designed
to reduce and eventually eliminate all load-rated bridges.
- Bridge
summary 1999
- Total:
15
- Total
cost: $3,062,509
Federal
Funds
- Contract
1997-5 - One bridge rehabilitation
- Corso Road Black Covered
Bridge
- Total project
cost: $804,832
See
News
Release
for info and photos.
-
- Contract
1998-504 - One bridge replacement
- Indian Creek Road
Bridge #00.498
- Contract amount:
$834,811
Before construction.
During construction.
During construction.
New bridge
completed.
-
- Contract
1998-505 - One bridge replacement
- LeSourdsville West
Chester Road Bridge #07.329
- Total project
cost: $418,492
Before construction.
During construction.
New bridge
completed.
-
- Contract
1999-603 - One bridge replacement
- Hamilton New London
Road Bridge #02.425
- Total project
cost: $265,737
During construction.
-
- Local
Funds By Contract
-
- Contract
1999-1 -- Four Bridge Deck Replacements
- Bonham Road Bridge
#00.388
- Myers Road Bridge
#00.019
- Scott Road Bridge
#00.618
- Tolbert Road Bridge
#01.718
- Total project
cost: $205,957
-
- Contract
1999-2 -- Four Bridge Deck Replacements
- California Road Bridge
#02.129
- Gates Road Bridge
#00.695
- Morgan Ross Road Bridge
#01.106
- Schoenling Road Bridge
#00.619
- Total project
cost: $159,925
-
- Contract
1999-3 -- Two Bridge Deck Replacements
- Mauds Hughes Road
Bridge #01.400
- Millikin Road Bridge
#04.435
- Total project
cost: $106,842
-
- Contract
1999-10 -- One Bridge Replacement
- West Chester Road
Bridge #01.616
- Total project
cost: $265,913
CULVERTS
The BCEO's Operations
Department is responsible for the annual inspection of all culverts
located on County and Township roads --- that number totaled
1,046 at the beginning of 1999. A culvert is a conduit running
underneath a road for the purpose of transferring storm water
runoff from one side of the road to another. Culverts are technically
classified as structures with a clear span of less than ten feet
and can be made of different types of material. Culvert replacements
are, like bridges, determined by the age and condition of the
structure and are often planned in conjunction with future resurfacing
projects.
BCEO culvert crew.
- Culvert
summary 1999
- Total:
36
- Total
cost: $327,397
-
- Local
Funds By Force Account
-
- 10
County Culvert Replacements
- Cincinnati Dayton
Road Culvert #09.655
- Hamilton Mason Road
Culvert #02.347
- Jacksonburg Road Culvert
#07.381
- Layhigh Road Culvert
#05.284
- Layhigh Road Culvert
#07.711
- Millikin Road Culvert
#03.151
- Morganthaler Road
Culvert #01.976
- Waynes Trace Culvert
#00.632
- Waynes Trace Culvert
#01.523
- West Alexandria Road
Culvert #00.048
- Total cost: $111,802
Cincinnati Dayton Road culvert
and catch basin installation.
-
- One
County Emergency Culvert Repair
- Augspurger Road Culvert
#01.834
- Total cost: $1,238
-
- 25
Township Culvert Replacements
- Butler Warren Road
Culvert #04.565
- Cochran Road Culvert
#00.140
- Cotton Run Road Culvert
#02.738
- Depot Road Culvert
#00.375
- Dunwoody Road Culvert
#00.437
- Dunwoody Road Culvert
#03.853
- Dunwoody Road Culvert
#03.957
- Gates Road Culvert
#00.111
- Gates Road Culvert
#00.221
- Gates Road Culvert
#00.338
- Gates Road Culvert
#00.631
- Gates Road Culvert
#00.767
- Harris Road Culvert
#00.221
- Harris Road Culvert
#01.939
- Huston Road Culvert
#00.670
- Layhigh Road Culvert
#01.960
- Mauds Hughes Road
Culvert #01.138
- Mauds Hughes Road
Culvert #01.315
- Morgan Ross Road Culvert
#00.774
- Morman Road Culvert
#03.517
- Oxford Middletown
Road Culvert #05.748
- Paullin Drive Culvert
#00.100
- Shollenbarger Road
Culvert #00.326
- Taylor Road Culvert
#01.325
- Thomas Road (Madison
Twp.) Culvert #02.186
- Total cost: $214,357
Construction of twin-pipe
Culvert #00.111 on Gates Road.
BCEO crews
remove old culvert on Harris Road
Shollenbarger
Road pipe culvert installation.
New Thomas Road Culvert #02.186.
-
- INTERSECTION
IMPROVEMENTS
-
- Intersection
summary 1999
- Total:
3
- Total
cost: $428,399
-
- Local
Funds By Contract
-
- Contract
1999-13 -- One Intersection Improvement: Turn lane addition and
signal upgrade (Contract also included paving. See Paving Contract
1999-13.)
- Hamilton Mason Road
at Ohio 747
- Intersection portion
of contract: $115,828
-
- One
Intersection Improvement -- Realignment
- West Chester Road
at Lakota West Drive
- Total project
cost: $287,261
- (Funding: West
Chester (Union) Twp/TIF)
-
- Temporary
signal installation
- Wayne Madison Road
at Ohio 73
- Total project cost:
$25,310
ROADWAY
IMPROVEMENTS
- Roadway
summary 1999
- Total:
2
- Total
cost: $200,397
-
- Local
Funds By Contract
-
- Contract
1999-4 -- Emergency repairs due to severe winter weather damage
- Millikin Road from
Ohio 747 to Yankee Road
- Total project
cost: $190,062
-
- Contract
R/0037/01/750 -- Curve realignment
- Indian Creek Road
between Imhoff Road and King Road
- Total project
cost: $10,335
PAVING
The Butler County Engineer's
Office is responsible for 270.89 miles (centerline miles) of
roadway and has a 12-15 year paving program in place. This system
enables roads to be resurfaced on a regular basis and maintained
routinely in a more cost-effective manner. Many Township roads
that are substandard in lane width and those County roads that
meet minimum standards only, where feasible, are also being widened
to bring them up to modern safety standards.
- Seventy-one miles of county, township, and municipal
roads were resurfaced in 1999. This also includes berming of
all major roads paved.
-
BCEO paving 1. Crews get ready
to roll.
BCEO paving 2.
-
- Paving
summary 1999
- Total
miles: 71.2
- Total
cost: $2,323,594
-
- Local
Funds By Contract
-
- Contract
1999-6 -- Resurfacing of various County and Township roads in
Hanover, Morgan, Reily, and Ross Townships
- Total miles: 13
- Total project
cost: $429,238
-
- Funded by the
County:
- Layhigh Road - Ohio
748 to Hamilton New London Road
- Stillwell Beckett
Road - U.S. 27 to Ohio 177
- Miles: 5.9
-
- Funded by Hanover
Township:
- Gene Avenue - Stahlheber
Road to cul-de-sac
- Hussey Road - U.S.
27 to dead-end
- Nichols Road - Lanes
Mill Road to Reily Twp line
- Miles: 2.2
-
- Funded by Morgan
Township:
- Jenkins Road - South
Wynn Road to dead-end
- North Wynn Road -
Layhigh Road to Ohio 129
- Miles: 1.3
-
- Funded by Reily
Township:
- Elgin Road - Stephenson
Road to dead-end
- Hart Road - Dunwoody
Road to CSX Railroad
- North Weaver Road
- Dunwoody Road to Peoria Reily Road
- Miles: 3.2
-
- Funded by Ross
Township:
- Donna Marie Drive
- Ohio 748 to dead-end
- Moore's Road - Hamilton
New London Road to dead-end
- Miles: 0.4
-
- Contract
1999-7 -- Chip seal of various County and Township roads in Oxford,
Reily, Liberty, and West Chester (Union) Townships
- Total miles: 14
- Total project
cost: $181,079
-
- Funded by the
County:
- Crescentville Road
- Windisch Road to Cincinnati Dayton Road
- Gates Road - Ohio
129 to dead end
- Hamilton Mason Road
- Bypass 4 to Ohio 747
- Kyles Station Road
- Ohio 747 to LeSourdsville West Chester Road
- Princeton Road - Ohio
747 to Cincinnati Dayton Road
- Tylersville Road -
I-75 to Butler Warren Road
- Miles: 12.2
-
- Funded by Oxford
Township:
- Shera Road - Stout
Road to Taylor Road
- Wallace Road - Woodruff
Road to dead end
- Woodruff Road - Wallace
Road to dead end
- Miles: 1.8
-
- Contract
1999-8 -- Resurfacing of various County and Township roads in
Milford, Oxford, and Wayne Townships
- Total miles: 11.8
- Total project
cost: $454,933
-
- Funded by the
County:
- Jacksonburg Road -
Jacksonburg corp. to Preble County line
- Waynes Trace Road
- U.S. 127 to Tolbert Road West
- Miles: 3.9
-
- Funded by Milford
Township:
- Billy Circle - Ohio
177 to cul-de-sac
- Depot Road - Wayne
Milford Road to dead-end
- Depot Road - Huston
Road to Hamilton Eaton Road
- Oxford Middletown
Road - State Road to dead-end
- Oxford Trenton Road
- Huston Road to Hamilton Mason Road
- Miles: 1.9
-
- Funded by Oxford
Township:
- Booth Road - Kehr
Road to CSX Railroad
- Doty Road - Todd Road
to Brown Road
- Wallace Road - U.S.
27 to Woodruff Road
- Miles: 2.1
-
- Funded by Wayne
Township:
- Cotton Run Road -
Taylor School Road to Ohio 73
- Cotton Run Road -
Oxford Middletown Road to Mill Road
- Tolbert Road - Cotton
Run Road to Jacksonburg Road
- Miles: 3.9
-
- Contract
1999-11 -- Resurfacing of various County and Township roads in
Lemon, Madison, and St. Clair Townships and the City of Monroe
- Total miles: 19.4
- Total project
cost: $834,387
-
- Funded by the
County:
- Beissinger Road -
Eaton Road to curve
- Morganthaler Road
- U.S. 127 to Trenton Road
- Trenton Franklin Road
- Ohio 122 to Ohio 4
- BC Environmental Services
service roads
- Miles: 6.3
-
- Funded by Lemon
Township:
- Carson Road - Yankee
Road to Monroe corp.
- Miles: 0.6
-
- Funded by Madison
Township:
- Cedar Glen Way - Cloister
Cliffs to cul-de-sac
- Cloister Cliffs Drive
- Sloebig Road to Thomas Road
- Darl Drive - dead-end
to dead-end
- Dickey Road - Kalbfleisch
Road to No Mans Road
- Flora Lane - Middletown
Germantown Road to cul-de-sac
- Hoover Court - Middletown
Germantown Road to cul-de-sac
- Myers Road - Browns
Run Road to Middletown Germantown Road
- Oakcroft Circle -
Cloister Cliffs Drive to cul-de-sac
- Ora Lane - Middletown
Germantown Road to cul-de-sac
- Pleasant Hill Cemetery
- Miles: 4.6
-
- Funded by St.
Clair Township:
- Beissinger Road -
Eaton Road to West Elkton Road
- Four Mile Creek Road
- Eaton Road to #784
- Gephart Road - Augspurger
Road to Trenton Road
- Hawkins Road - Trenton
Road to Gephart Road
- West Elkton Road -
Beissinger Road to New Miami corp.
- St. Clair Township
Administrative Center parking lot
- Miles: 4.8
-
- Funded by City
of Monroe:
- American Way - Ohio
63 to cul-de-sac
- Breeden Drive - Lebanon
Avenue to new section
- Garver Road - Ohio
63 to Cincinnati Dayton Road
- Lebanon Avenue - Garver
Road to cul-de-sac
- New Garver Road -
Ohio 63 to Garver Road
- Ohio Avenue - Britton
Lane to Main Street
- Seminary Drive - Britton
Lane to new pavement
- Todhunter Road - repairs
near Ohio 4
- Monroe maintenance
garage
- North Monroe Cemetery
- Miles: 3.1
-
- Contract
1999-12 -- Paving of Township Roads in Liberty, West Chester
(Union), and Fairfield Townships
- Total miles: 11.9
- Total project
cost: $325,689
-
- Funded by Liberty
Township:
- Bethany Road - Cincinnati
Dayton Road to Butler Warren Road
- Hamilton Mason Road
- Mauds Hughes Road to Cincinnati Dayton Road
- LeSourdsville West
Chester Road - Hamilton Mason Road to Millikin Road
- Mauds Hughes Road
- Princeton Road to N&S Railroad bridge
- Mauds Hughes Road
- Millikin Road to Kyles Station Road
- Millikin Road - Cincinnati
Dayton Road to Butler Warren Road
- Moselle Drive - Liberty
Fairfield Road to curb section
- Sauterne Court - Moselle
Drive to cul-de-sac
- Sauterne Drive - Moselle
Drive to curb section
- Tarragon Drive - Hamilton
Mason Road to cul-de-sac
- Port Lane - Moselle
Drive to cul-de-sac
- Miles: 8.2
-
- Funded by West
Chester (Union)Township:
- Butler Warren Road
- Luster Drive to Tylersville Road
- Lakota West H.S. driveway
at West Chester Road and Lakota West Drive
- Miles: 1.3
-
- Funded by Fairfield
Township:
- Blue Heron Drive -
Red Bird Lane to new section
- Blue Ridge Drive -
dead-end to dead-end
- Conover Drive - Osage
Drive to Ravena Drive
- Crest Manor Drive
- Green Crest Drive to Blue Ridge Drive
- Gateway Drive - Headgates
Road to dead-end
- Green Crest Drive
- Crest Manor Drive to #5896
- Kimberly Drive - Pleasant
Ridge Drive to dead-end
- Logsdon Road - Hamilton
Mason Road to cul-de-sac
- Old Hickory Drive
- Ann Elise Court to Crest Manor Drive
- Pearl Crest Drive
- Crest Manor Drive to dead-end
- Pleasant Ridge Drive
- Kimberly Drive to dead-end
- Ravena Drive - Canastota
Drive to dead-end
- Redbird Drive - Gateway
Drive to dead-end
- Miles: 2.4
-
- Contract
1999-13 -- Paving of County road in West Chester (Union) Twp
(Contract also included intersection improvement. See Intersection
Improvements Contract 1999-13.)
- Total miles: 1.1
- Paving portion
of contract: $98,268
-
- Funded by the
County:
- Windisch Road - Crescentville
Road to Allen Road
- Miles: 1.1
GENERAL/SEASONAL
ROADWAY MAINTENANCE
The Operations Department
of the Butler County Engineer's Office is responsible for all
Force Account projects as well as the general day-to-day maintenance
and seasonal-type maintenance of bridges and roads on the County
roadway system. This includes ditching and drainage projects,
painting and striping of roads, signing, patching, pavement repair,
bridge repair, berm work, guardrail repair, mowing, brush and
weed control, and snow and ice control. Also included is emergency
maintenance such as storm damage, downed trees, high water and
flooding problems, and any debris that poses an immediate safety
hazard to the motoring public.
- Total spent on
general maintenance: $1,071,844
Piping along Hamilton New
London Road at Black Road.
-
- 1999
Snow and Ice Control
-
- A major outbreak of
winter weather opened 1999 keeping snow and ice control crews
in continuous operation for nearly two full weeks. Successive
snow, ice, and freezing rain storms plodded through Butler County
prompting issuance of a Level 2 Snow
Emergency at one point. BCEO crews kept all roads open despite
occasional salt delivery problems throughout the Midwest. Early
March brought with it the season's last significant snow storm
which dumped 6-9 inches of heavy wet snow. Most other snow events
were relatively minor, including two light snows late in the
year.
-
- The Butler County
Engineer's Office completed construction of a larger salt
dome last year in a move to improve snow and ice control
efficiency and reduce the risk of low salt supplies. The new
storage facility holds 6,500 tons of salt on site as compared
with the former 1,800-ton facility. A new truck with a wing plow
for multi-lane plowing was also purchased. Outfitted with two
blades, the truck is capable of handling two lanes in one pass.
-
- A new Snowfighters
page was developed here on our web site in 1999. The page
provides an in-depth overview of BCEO snow and ice control as
well as some local winter history. Motorists may also visit our
Road Conditions page for status
reports on state and local roadways during inclement weather.
-
- Total road salt
used: 3,093 tons (1998 = 1,594 tons)
- Total calcium
chloride used: 9,502 gallons (1998 = na)
- Total man-hours
utilized for snow-and-ice control: 6,534 hours (1998 = 2,117
hours)
- Total labor cost:
$110,986 (1998 = $42,135)
- New salt dome
construction: $167,500
New salt dome.
New salt truck with wing plow.
RAILROAD
CROSSINGS
Railroad crossing safety
is a major concern of the County Engineer's Office. The number
of crossing accidents continues to decline in Butler County despite
increased traffic volumes due in part to the BCEO's close work
with major railroad companies.
- Federal
Funds
-
- Contract
1999-601 -- One crossing upgrade and realignment; elimination
of two nearby crossings at Law Road and Pierson Road
- Garver Elliot Road
(new section named Garver Stillwell Road) at CSX Railroad
- Total project
cost: $366,267
Old Garver Elliot Road / CSX
Railroad crossing.
Newly realigned Garver Elliot
Road.
-
- Local
Funds
-
- Installation
of new rubberized crossings
- Morman Road at CSX
Railroad
- Trenton Franklin Road
at CSX Railroad
- Total project
cost: $7,200
- (Additional funding:
CSX)
-
- OTHER
-
- Federal
Funds
-
- Contract
1999-602 -- Bike path project
- Cox Road Bikeway from
Barret Road to Tylersville Road
- Total project
cost: $343,522
- (Additional funding:
West Chester (Union) Twp. Engineering/Administration: BCEO)
-
- Community
Development Block Grant Funds
-
- Contract
B-F-98-009-1 -- Two projects
- Madison Township -
West Middletown storm sewer improvements
- Millville, Village
of - Liberty Street improvements
- Total project
cost: $202,740
West Middletown storm sewer
installations along Trenton Franklin Road.
-
- Contract
CDBG-99-1 -- Six projects
- Lemon Township - Oxford
State Road flood and drainage improvements
- Madison Township -
Poasttown Heights flood and drainage improvements
- Reily Township - Dunwoody
Road improvements
- Seven Mile, Village
of - Mill Street storm sewer improvements
- Somerville, Village
of - Walnut Street flood and drainage improvements
- Trenton, City of -
Third Street resurfacing
- Total project
cost: $475,164
-
- Local
Funds By Contract
-
- Contract
1999-5 -- Center lining and edge lining of various County and
Township roads, and roads in the City of Monroe
- Center miles: 200.5
- Edge miles: 389.2
- Multi lane miles:
21.6
- Total project cost:
$106,162
-
- Embankment
slip temporary repairs
- Elk Creek Road
- Total cost: $35,389
Elk Creek Road embankment
slip.
-
- Embankment
slip repairs
- California Road
- Total cost: $15,645
-
- Local
Funds By Contract (Commissioner's Capital Improvement Program)
-
- Contract
CIP-99-1 -- Five projects
- Hanover/Reily Townships
- DeCamp Road repair and resurfacing
- Liberty Township -
Princeton Rd repair and resurfacing between Cin Day Rd and But
War Rd
- Morgan Township -
Paving of new administration center
- Seven Mile, Village
of - Pennsylvania Ave repair and resurfacing; alley repair and
resurfacing
- Wayne Township - Tolbert
Road repair and resurfacing from Ohio 503 to Cotton Run Rd
- Total cost: $367,542
-
- Local
Funds By Force Account
-
- Drainage
Improvement
- Morris Road at Dust
Commander Drive
- Total project cost:
$16,247