Capital Improvements Report
Fairfield
Township
- Betsy Ross Court from
Betsy Ross Drive to cul-de-sac
- Resurfacing.
- Complete. Cost: $4,893.
Funding: Fairfield Twp.
- Betsy Ross Drive from
Red Coat Drive to cul-de-sac
- Resurfacing.
- Complete. Cost: $11,254.
Funding: Fairfield Twp.
- Canal Road between
Allison Avenue and Headgates Road
- Significant roadway
washouts and emergency repairs from July 2001 flash flooding.
- Complete. Cost: $250,000.
Funding: FEMA.
- News
release: Repairs
begin.
- Photo 1: Storm damage (Jul 01).
- Photo 2: Storm damage (Nov 01).
- Photo 3: Completed repairs (Sep 02).
- Photo 4: Completed repairs (Sep 02).
- Clarion Court from
cul-de-sac to cul-de-sac
- Resurfacing.
- Complete. Cost: $13,863.
Funding: Fairfield Twp.
- East Ridge Drive from
Headgates Road to cul-de-sac
- Resurfacing.
- Complete. Cost: $18,104.
Funding: Fairfield Twp.
- Fernway Drive from
Hamilton corp. to dead end
- Resurfacing.
- Complete. Cost: $22,276.
Funding: Fairfield Twp.
- Greenlawn Road from
Millikin Road to Ohio 4
- Resurfacing.
- Complete. Cost: $43,287.
Funding: Fairfield Twp.
- Hollytree Court from
East Ridge Drive to dead end
- Resurfacing.
- Complete. Cost: $8,022.
Funding: Fairfield Twp.
- Kelso Court from Red
Coat Drive to cul-de-sac
- Resurfacing.
- Complete. Cost: $5,872.
Funding: Fairfield Twp.
- Liberty Bell Court
from Red Coat Drive to cul-de-sac
- Resurfacing.
- Complete. Cost: $8,807.
Funding: Fairfield Twp.
- Liberty Fairfield
Road at Princeton Road
- Intersection improvement
- Add turn left lanes and signals, improve sight distance, cut
down hill and replace bridge west of intersection, raise profile
slightly on east side of intersection.
- Project
mostly complete. Final paving and signalization to be
completed in spring 2003. ODOT managing construction phase. Cost:
$883,411. Funding: Federal, BCEO.
- Photo 1:
Intersection before construction. View west.
- Photo 2: Utility relocations. View south (Jun
02).
- Photo 3: Utility relocations. View south (Jun
02).
- Photo 4: Construction. View east. (Nov 02).
- Princeton Road east
side of Bypass 4 intersection
- Add turn lane, raise
vertical alignment and improve sight distance on Princeton, northbound
lane addition to Bypass 4 on north and south sides of intersection.
- Complete.
Project
is phase 2 of improvements begun in 2001. BCTID administers contract.
BCEO manages construction. Cost: $1.8 million. Funding: TIF thru
Fairfield Twp.
- Why the road will be closed
for 14 weeks.
- Photo 1: Phase 1 nearly complete, looking east
on Princeton Road toward intersection (2001).
- Photo 2: View west on Princeton Road toward intersection.
Phase 2 section (Jun 02).
- Photo 3: Completed project. View west on Princeton
Road toward intersection. (Oct 02).
- Red Coat Drive from
Saratoga to #7492
- Resurfacing.
- Complete. Cost: $19,327.
Funding: Fairfield Twp.
- Reigart Road from
new pavement to MetroPark entrance
- Resurfacing.
- Complete. Cost: $79,132.
Funding: Fairfield Twp.
- Saratoga Court from
Saratoga Drive to cul-de-sac
- Resurfacing.
- Complete. Cost: $6,932.
Funding: Fairfield Twp.
- Saratoga Drive from
Clarion Court to Morris Road
- Resurfacing.
- Complete. Cost: $25,857.
Funding: Fairfield Twp.
- Theodore Drive from
Ohio 4 to Fernway Drive
- Resurfacing.
- Complete. Cost: $24,413.
Funding: Fairfield Twp.
- Tylersville Road east
of Five Points intersection
- Storm sewer installations.
- Complete.
Cost:
$101,000. Funding: State CDBG.
Hanover
Township
- Four Mile Creek Road
Bridge #01.876
- Bridge repairs and
stream bank rebuilt.
- Complete. Cost: $40,000.
Funding: BCEO Force Account.
- Photo: Top view before repairs.
- Photo: Side view before repairs.
- Photo: Side view after repairs. Bank rebuilt
to prevent erosion.
- Isabella Lane from
Regina Place to Columbus Drive South
- Resurfacing.
- Complete. Cost: $13,570.
Funding: Hanover Twp.
- Millville Cemetery
- various locations
- Resurfacing.
- Complete.
Cost:
$16,498. Funding: Hanover Twp.
- Nichols Road Bridge
#01.30
- Deck replacement.
- Complete. Cost: $40,000.
Funding: BCEO.
- Photo:
Top view (Jun 02).
- Photo:
Side view (Jun 02).
- Salvatore Place from
Regina Place to dead end
- Resurfacing.
- Complete. Cost: $23,250.
Funding: Hanover Twp.
- Stahlheber Road from
Reily Twp line to U.S. 27
- Resurfacing.
- Complete. Cost: $87,981.
Funding: Hanover Twp.
Lemon
Township
Liberty
Township
- Angie Drive from Liberty
Fairfield Road to cul-de-sac
- Resurfacing.
- Complete. Cost: $9,243.
Funding: Liberty Twp.
- Belvoir Circle from
cul-de-sac to cul-de-sac
- Resurfacing.
- Complete. Cost: $6,437.
Funding: Liberty Twp.
- Bethany Road from
Cincinnati Dayton Road to Butler Warren Road
- Resurfacing.
- Complete. Cost: $121,902.
Funding: Liberty Twp.
- Butler Warren Road
at Bethany Road
- Intersection improvement
including left turn lane additions, and roadway and bridge improvements
to Butler Warren.
- Complete. Joint project
design by BCEO and Warren County Engineer's Office. Cost: $492,956.
Construction cost shared by BCEO, Warren County Engineer's Office,
and City of Mason: Butler County share $227,136, Warren County
share $241,821, City of Mason share $23,999.
- Photo: Completed.
- Dartford Way from
Deer Run to Millikin Road
- Resurfacing.
- Complete. Cost: $10,144.
Funding: Liberty Twp.
- Deer Run from Dartford
Way to cul-de-sac
- Resurfacing.
- Complete. Cost: $18,001.
Funding: Liberty Twp.
- Eddington Drive from
Devon Drive to Dartford Way
- Resurfacing.
- Complete. Cost: $21,714.
Funding: Liberty Twp.
- Hamilton Mason Road
at Norfolk & Southern Railroad
- Overpass repairs.
- Complete.
Funding:
N&S
- Liberty Fairfield
Road at Princeton Road
- Intersection improvement
- Add turn left lanes and signals, improve sight distance, cut
down hill and replace bridge west of intersection, raise profile
slightly on east side of intersection.
- Project
mostly complete. Final paving and signalization to be
completed in spring 2003. ODOT managing construction phase. Cost:
$883,411. Funding: Federal, BCEO.
- Photo 1:
Intersection before construction. View west.
- Photo 2: Utility relocations. View south (Jun
02).
- Photo 3: Utility relocations. View south (Jun
02).
- Photo 4: Construction. View east. (Nov 02).
- Liberty Township Bikeway
- Phase 4 construction.
- Completion:
spring 2003. BCEO administering design and contruction. Construction:
October 21, 2002. Cost: $296,000. Funding: Federal, Liberty Twp.
- Liberty Township Fire
Station #2 and maintenance lot
- Resurfacing.
- Complete. Cost: $12,426.
Funding: Liberty Twp.
- Millikin Road from
Mauds Hughes Road to Cincinnati Dayton Road
- Resurfacing.
- Complete. Cost: $377,173.
Funding: BCEO.
- Newgate Place from
Eddington Drive to cul-de-sac
- Resurfacing.
- Complete. Cost: $6,180.
Funding: Liberty Twp.
- Princeton Road Culvert
#00.809
- Culvert replacement.
- Complete. Funding: BCEO
Force Account.
- Severn Place from
cul-de-sac to cul-de-sac
- Resurfacing.
- Complete. Cost: $6,463.
Funding: Liberty Twp.
- Van Gordon Road from
Hamilton Mason Road to Princeton Road
- Resurfacing.
- Complete. Cost: $111,094.
Funding: Liberty Twp.
- Warrington Court from
Eddington Drive to cul-de-sac
- Resurfacing.
- Complete. Cost: $3,005.
Funding: Liberty Twp.
- Yankee Road from Dutchland
Boulevard to Princeton Road
- Resurfacing.
- Complete. Cost: $97,567.
Funding: BCEO.
Madison
Township
- Ada Drive from cul-de-sac
to cul-de-sac
- Resurfacing.
- Complete. Cost: $6,733.
Funding: Madison Twp.
- Elk Creek Road Culvert
#06.914
- Culvert replacement.
- Complete. Funding: BCEO
Force Account.
- Elk Creek Road Culvert
#07.244
- Culvert replacement.
- Complete. Funding: BCEO
Force Account.
- Photo: Completed.
- Ernestine Drive from
Jo Anne Lane to dead end
- Resurfacing.
- Complete. Cost: $2,865.
Funding: Madison Twp.
- Eunice Drive from
Jo Anne Lane to Elk Creek Road
- Resurfacing.
- Complete. Cost: $2,640.
Funding: Madison Twp.
- Howe Road from Wayne
Madison Road to Elk Creek Road
- Resurfacing.
- Complete. Cost: $32,806.
Funding: Madison Twp.
- Kiester Road from
Hetzler Road to Beck Road
- Resurfacing.
- Complete. Cost: $33,086.
Funding: Madison Twp.
- Madison Township administration
building driveway
- Resurfacing.
- Complete. Cost: $1,874.
Funding: Madison Twp.
- Marts Drive from Circle
Parkway to Mosiman Road
- Resurfacing.
- Complete. Cost: $13,311.
Funding: Madison Twp.
- No Mans Road from
Elk Creek Road to Dickey Road
- Resurfacing.
- Complete. Cost: $8,231.
Funding: Madison Twp.
- Norma Drive from Ohio
122 to Ada Drive
- Resurfacing.
- Complete. Cost: $2,622.
Funding: Madison Twp.
- Prichard Road from
dead end to Montgomery County line
- Resurfacing.
- Complete.
Cost:
$6,758. Funding: Madison Twp.
- Radabaugh Road from
Sycamore to Ohio 73
- Resurfacing.
- Complete. Cost: $22,795.
Funding: Madison Twp.
- Renee Drive from Ohio
122 to Elk Creek Road
- Resurfacing.
- Complete. Cost: $13,235.
Funding: Madison Twp.
- Sloebig Road Bridge
#00.019
- Emergency deck repairs.
- Complete. Cost: $40,000.
Funding: BCEO Force Account.
- Photo: View from Browns Run Road.
- Photo: Side view.
- Thomas Road from Sloebig
Road to Middletown Germantown Road
- Resurfacing.
- Complete. Cost: $23,454.
Funding: Madison Twp.
- Trenton Franklin Road
at Ohio 122
- Piping and drainage
improvements.
- Complete.
Funding:
BCEO.
- Trenton Franklin Road
at CSX Railroad
- Crossing repairs.
- Complete.
Funding:
CSX
- Wayne Madison Road
at CSX Railroad
- Crossing replacement.
- Complete.
Funding:
CSX
- Photo: Completed.
- West Alexandria Road
at Elk Creek Road
- Intersection improvement.
- Complete.
Cost:
$175,000. Funding: State CDBG, CIP.
- Photo 1: View of intersection from West Alexandria
Road - before construction.
- Photo 2: View of intersection from West Alexandria
Road - during construction.
- Photo 3: Complete. View northwest.
- West Alexandria Road
Culvert #00.361
- Culvert replacement.
- Complete. Cost: $40,000.
Funding: BCEO Force Account.
- Photo: Existing culvert (Jun 02).
- West Alexandria Road
Culvert #01.630
- Culvert replacement.
- Complete. Cost: $40,000.
Funding: BCEO Force Account.
- West Alexandria Road
Culvert #01.698
- Culvert repairs -
Cut headwalls and replace guardrail.
- Complete. Cost: $40,000.
Funding: BCEO Force Account.
- West Alexandria Road
from Strebee Road to Montgomery County line
- Resurfacing.
- Complete. Cost: $37,829.
Funding: Madison Twp.
Milford
Township
- Baker Road Bridge
#00.135
- Deck replacement.
- Complete.
Cost:
$40,000. Funding: BCEO Force Account.
- Photo.
- Bauer Road Bridge
#00.807
- Deck repairs and guardrail
replacement.
- Complete. Cost: $40,000.
Funding: BCEO Force Account.
- Photo:
Top view (Jun 02).
- Photo:
Side view (Jun 02).
- Oxford Middletown
Road from U.S. 127 to Hamilton Eaton Road
- Resurfacing.
- Complete. Cost: $17,866.
Funding: Milford Twp.
- State Road from Ohio
744 to dead end
- Resurfacing.
- Complete. Cost: $39,574.
Funding: Milford Twp.
Morgan
Township
- California Road Bridge
#04.312 (over Dry Fork Creek)
- Bridge replacement.
- Complete.
Contract
amount: $1,947,075. Funding: Federal LPA, BCEO.
- News
release: New
California Road Bridge Opens - Bridge Dedicated to All U.S. Veterans
and POWs (Jul 18, 02).
- News
release: Old
bridge closing. New bridge construction begins (Jan 2, 02).
- Photo 1:
Old bridge (1999).
- Photo 2:
New bridge construction. View south across Dry Fork Creek ravine
(Mar 02).
- Photo 3:
View north. New road alignment to right approaching bridge from
south (Mar 02).
- Photo 4:
New bridge construction. View east from bottom of ravine (Mar
02).
- Photo 5:
New bridge construction (Mar 02).
- Photo 6:
New bridge construction (Mar 02). Road to old bridge can be seen
along hillside. Since new bridge will be on straighter alignment,
the dangerous S-curves approaching old bridge will be eliminated.
- Photo 7:
Setting new bridge beams (Mar 02).
- Photo 8:
New bridge beams - side angle (Mar 02).
- Photo 9:
Setting new beams. View north (Mar 02).
- Photo 10:
Newly placed beams. View north - closeup (Mar 02).
- Photo 11:
Newly placed beams. View south (Mar 02).
- Photo 12:
View north. Newly realigned road approaching bridge from south
(Jun 02).
- Photo 13:
New bridge construction - west side angle (Jun 02).
- Photo 14:
New bridge construction - east side angle (Jun 02).
- Photo 15:
New bridge construction - crane shot (Jun 02).
- Photo 16:
New bridge construction - side angle (Jul 02).
- Photo 17:
New bridge construction - beam closeup, side angle (Jul 02).
- Photo 18:
New bridge construction - side angle. View north (Jul 02).
- Photo 19:
New bridge (Jul 02).
- Photo 20:
New bridge - underside view (Jul 02).
- Photo 21:
New approach to bridge. View north (Jul 02).
- Photo 22:
New bridge dedication / ceremonial ribbon cutting. Left to right
- State Rep. Shawn Webster, Butler County Commissioner Courtney
Combs, WWII Veteran/POW & BCEO Federal Aid Consultant Bob
Petrocy, Butler County Engineer Greg Wilkens, Morgan Twp Trustee
Nancy Poe with husband (Jul 18, 02).
- Photo 23:
New bridge dedication / ceremonial ribbon cutting. Several veterans
and public officials line up behind the ribbon. (Jul 18, 02).
- Photo 24:
New bridge dedication / ceremonial ribbon cutting. WWII Veteran/POW
& BCEO Federal Aid Consultant Bob Petrocy snips the ribbon
with the ceremonial scissors while Butler County Commissioner
Courtney Combs holds the ribbon. (Jul 18, 02).
- Photo: 25: New bridge dedication / ceremonial ribbon
cutting. Butler County Engineer and WWII Veteran/POW & BCEO
Federal Aid Consultant Bob Petrocy next to red, white, and blue
sign. (Jul 18, 02).
- Photo 26: New bridge. High view north. (Oct 02).
- Photo 27: New bridge. Side view north. (Oct 02).
- Photo 28: New bridge. High view south. (Oct 02).
- Photo 29: New bridge. View north. (Oct 02).
- Photo 30: New bridge. High view north. (Oct 02).
- Photo 31: New bridge. High view north. (Oct 02).
- Photo 32: New bridge. Side view from below. (Oct
02).
- California Road Bridge
#05.789
- Bridge replacement.
- Complete. Cost: $82,500.
Funding: State Issue 2, BCEO.
- News
Release.
- Photo:
Top view, old bridge (Jun 02).
- Photo:
Side view, old bridge (Jun 02).
- Morgan Ross Road from
Layhigh Road to maintenance line
- Resurfacing.
- Complete. Cost: $43,350.
Funding: Morgan Twp.
- Race Lane Road Bridge
#02.415
- Partial deck and beam
replacements.
- Complete. Cost: $40,000.
Funding: BCEO Force Account.
- Photo 1: Top view of bridge (Jan 02).
- Photo 2: Plate covering pavement and expansion
joint deterioration (Jan 02).
- Photo 3: Side view of expansion joint deterioration
(Jan 02).
- Photo 4: Removing portion of deck (Apr 02).
- Photo 5: Deteriorated bridge beams (Apr 02).
- Photo 6: Top view of deteriorated beam (Apr 02).
Oxford
Township
- Pamajera Drive from
Stillwell Beckett Road to cul-de-sac
- Resurfacing.
- Complete. Cost: $15,658.
Funding: Oxford Twp.
- Stout Road Culvert
#00.900
- Culvert replacement
and some improvements to intersection at Hayworth Road.
- Complete. Cost: $40,000.
Funding: BCEO Force Account.
- Tamara Court from
Pamajera Drive to cul-de-sac
- Resurfacing.
- Complete. Cost: $2,022.
Funding: Oxford Twp.
- Taylor Road Culvert
#00.003
- Culvert replacement
and some improvements to intersection at Contreras Road.
- Complete. Cost: $40,000.
Funding: BCEO Force Account.
- Photo:
Old culvert (Jun 02).
- Taylor Road from Ringwood
Road to U.S. 27
- Resurfacing.
- Complete. Cost: $51,269.
Funding: Oxford Twp.
Reily
Township
- Garver Elliot Road
from Stephenson Road to Bunker Hill Woods Road
- Resurfacing.
- Complete. Cost: $90,000.
Funding: Reily Twp.
- Garner Road Bridge
#02.223
- Emergency repairs.
- Complete.
Bridge
damaged after being struck by vehicle.
- Photo 1: Top view of damaged bridge.
- Photo 2: Side view. Spacer blocks, guardposts,
rail damaged. No damage to beams underneath.
- Hart Road from Ohio
129 to Dunwoody Road
- Resurfacing.
- Complete. Cost: $56,625.
Funding: Reily Twp.
- Indian Creek Road
Bridge #01.360
- Deck repairs.
- Complete. Funding: BCEO
Force Account.
- Photo 1: Top and side view of bridge.
- Photo 2: Top view.
- Photo 3: Plates covering pavement and expansion
joint deterioration.
- Photo 4: Deck repairs begin. Portion of deck
removed exposing deteriorated beams.
- Stillwell Beckett
Road Culvert #03.770
- Culvert replacement.
- Complete. Cost: $40,000.
Funding: BCEO Force Account.
- Stillwell Beckett
Road at CSX Railroad
- Emergency crossing
replacement.
- Complete. Funding: CSX
Ross
Township
- Herman Road from Hamilton
New London Road to Ohio 128
- Resurfacing.
- Complete. Cost: $149,725.
Funding: Ross Twp.
- Ohio 128 at Krause
Lane / Rossgate Drive
- Intersection improvement.
- Complete. Cost: $128,000.
Funding: private.
- News
release: Project begins.
St.
Clair Township
- Augspurger Road at
CSX Railroad
- Crossing replacement.
- Complete. Funding: CSX
- Eaton Road at Taylor
School Road
- Intersection improvement.
- Complete. Cost: $95,428.
Funding: BCEO.
- News
release.
- Photo: Construction. View north. (Jun 02).
- Photo: Completed. View north. (Aug 02).
- Hamilton Eaton Road
from New Miami corp. to U.S. 127
- Resurfacing.
- Complete. Cost: $32,305.
Funding: BCEO.
- Jackson Road at CSX
Railroad
- Crossing replacement.
- Complete.
Funding:
CSX
- Morganthaler Road
at CSX Railroad
- Crossing replacement.
- Complete.
Funding:
CSX
- Trenton Road at CSX
Railroad
- Crossing replacement.
- Complete.
Funding:
CSX
- Photo: Completed.
- Wayne Madison Road
at CSX Railroad
- Crossing replacement.
- Complete.
Funding:
CSX
- Photo: Completed.
- Wehr Road at CSX Railroad
- Crossing replacement.
- Complete.
Funding:
CSX
Wayne
Township
- Eaton Road at Taylor
School Road
- Intersection improvement.
- Complete. Cost: $95,428.
Funding: BCEO.
- News
release.
- Photo: Construction. View north. (Jun 02).
- Photo: Completed. View north. (Aug 02).
- Oxford Middletown
Road Culvert #07.048
- Culvert replacement.
- Complete. Cost: $40,000.
Funding: BCEO Force Account.
- Oxford Middletown
Road from Ohio 503 to Ohio 744
- Resurfacing.
- Complete.
Cost:
$90,955. Funding: Wayne Twp.
- Oxford Middletown
Road Bridge #06.910
- Bridge replacement.
- Complete. Cost: $80,000.
Funding: State Issue 2, BCEO.
- News
Release.
- Photo: Old bridge.
- Photo: New bridge - Top view (Nov 02).
- Photo: New bridge - Side view (Nov 02).
- Shurz Road from Stubbs
Road to Preble County line
- Resurfacing.
- Complete. Cost: $50,936.
Funding: Wayne Twp.
- Stubbs Road from Jacksonburg
Road to Shurz Road
- Resurfacing.
- Complete. Cost: $39,940.
Funding: Wayne Twp.
West
Chester Township
- Centre Pointe Drive
- New road extension
from Muhlhauser Road to Union Center Boulevard
- Complete.
Funding:
West Chester Twp TIF.
- Cincinnati Dayton
Road from I-75 to Mauds Hughes Road
- Roadway improvement
-- Widen to 5 lanes; I-75 overpass and ramp reconstruction.
- Complete. Contract awarded
by ODOT to C.J. Mahan Construction Co. for $11,946,378.39. Funding:
Federal, State Issue 2, BCEO.
- News
Release (Project completion.)
- Photo 1: Cincinnati Dayton
Road construction looking north from Fountains Boulevard (Jan
02).
- Photo 2: Cincinnati Dayton
Road bridge over I-75 (Feb 02). New half now open to traffic.
Old bridge to be removed so that second half of new bridge can
be built.
- Photo 3: Ready to pave
new lanes along east side of widened roadway. View north (Jun
02).
- Photo 4: Paving new lanes
along east side of widened roadway. West lanes remain open to
northbound and southbound traffic. View south (Jun 02).
- Photo 5: Construction
at I-75 overpass. Traffic rerouted onto new section of bridge.
View south (Jun 02).
- Photo: Completed project.
- Cincinnati Dayton
Road from Gano Road (west section) to Union Centre Boulevard
- Resurfacing.
- Complete.
One
inch overlay only. Cost: $87,022. Funding: BCEO.
- Cox Road from Tylersville
Road to Hamilton Mason Road
- Roadway improvement
-- Widen to five lanes; addition of multiple turn lanes.
- Complete:
spring 2003. Final paving, striping, and application of raised
pavement markers to be completed in spring 2003. Intersection
at Cox and Tylersville to be re-configured with new signals in
spring 2003. Project cost: $5.5 million. Funding: Butler County
TIF.
- News
Release.
- Photo: Construction.
View south. Heavy rains create poor working conditions (Jun 02).
- Crescentville Road
at N&S Railroad west of Windisch Road
- Railroad crossing
upgrade and turn lane addition.
- Complete. Funding: Norfolk
& Southern Railroad.
- Hadley Drive
- Storm sewer and storm
damage repair.
- Complete. Cost: $108,479.
Funding: West Chester Twp. BCEO managed construction for West
Chester Twp.
- Photo: Construction wraps up.
- Hamilton Mason Road
at Norfolk & Southern Railroad
- Overpass repairs.
- Complete.
Funding:
CSX
- Port Union Road from
Fairfield corp. to Ohio 747
- Roadway improvement
-- Widen to three lanes; cut down hill and improve alignment;
replace bridge.
- Completion:
spring 2003. Road now open to thru traffic; however, work on
the project will continue through the winter. During this final
construction phase, the road will remain open with two lanes
and temporary striping until the project is completed next spring.
- Contractor:
Don S. Cisle Contractor, Inc. Cost: $1.7 million. Funding: State
Issue 2, BCEO, West Chester Twp.
- News
Release.
- Photo 1:
View east from near LeSaint Drive (Feb 02).
- Photo 2:
Approaching west end of project traveling east (Feb 02). New
road will look like this portion in Fairfield. Hill in distance
to left of picture will be cut down.
- Photo 3:
Utility relocations near Gold Park Drive and Ohio 747 (Feb 02).
- Photo 4:
Cutting down the hill, western end of project. View east. (Jun
02).
- University Point project
- Construction of new
streets in University of Cincinnati Physicians Medical Center
Complex: Cox Lane, University Court, University Drive.
- Complete. Project in
conjunction with Cox Road improvements, but let as separate contract.
Cost: $1,534,458. Funding: Butler County TIF.
- News
Release.
- West Chester Road
from Barret Road to U.S. 42
- Resurfacing.
- Complete. Cost: $131,438.
Funding: BCEO.
- Photo: Completed.
- Plus, resurfacing
of various township roads
- Complete. Funding: West
Chester Twp.
All Townships
- Various township culvert
replacements - Most listed above.
- Complete.
- Resurfacing of various
township roads - Most listed above.
- Complete.
- County and township
centerline and edgeline striping
- Complete. Cost: $100,000.
Funding: BCEO.
- Mowing and weed spray
program
- Seasonal
/ ongoing. No road closures. Funding: BCEO FA.
- Ditching
- Seasonal
/ ongoing. No road closures. Funding: BCEO FA.
Project
questions? Email us. We'll send you a prompt reply.
|
- Questions
or comments about this web site? Email to BCEO
Webmaster.
-
|
|