- Completed
Projects - 2006
|
Last
updated: December 28, 2006
Additional source: 2006
Capital Improvements Report
Select
a township by clicking on it.
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
Various County roads |
Centerline and edgeline
restriping / retracing |
COMPLETE. Cost: $240,766. Funding:
BCEO
Photo |
|
Various County roads |
Installation of raised
pavement markers |
COMPLETE. Cost: $54,955. Funding:
Federal LPA
Photo |
|
Various County roads |
Ditching / mowing /
weed spraying |
Seasonal, ongoing maintenance.
Funding: BCEO FA |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
ALLISON AVE culvert |
Replacement (replace
culvert w/ bridge) |
COMPLETE. Funding: Ffd Twp |
|
ANN ELISE CT - Millcrest Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
BROOKE MEADOWS CT
- cul-de-sac
to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
CANAL RD - Headgates Rd to dead end |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
CASSANDRA CT - Penelope Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
CATHLEEN CT - Dawn Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
DAWN DR - #3520 to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
EAST RIDGE AVE culvert |
Replacement (replace
culvert w/ bridge) |
COMPLETE. Funding: Ffd Twp |
|
ELENOR DR - Mindy Dr to Penelope Dr |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
HAMILTON MASON RD
at LIBERTY FAIRFIELD RD |
Signalization |
COMPLETE. Est cost: $75,000.
Funding: BCEO
Photo:
New signals - view east
Photo:
Advance warning signs - view west |
|
HICKORY GLEN DR - Jenny Marie Crest to Liberty
Fairfield Rd |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
JENNY MARIE CREST
- cul-de-sac
to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
LIBERTY FAIRFIELD
RD - Ohio
4 to Great Miami River bridge |
Resurfacing |
COMPLETE. Est cost: $92,000. Funding:
BCEO |
|
MILLCREST DR - #4079 to Hickory Glen |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
MINDY DR - Millikin Rd to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
OLD HICKORY DR - Ann Elise Ct to Crest Manor
Dr |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
OLD LINE LN - Headgates Rd to dead end |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
PENELOPE DR - Elenor Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Ffd Twp |
|
RIVER RD Bridge #00.722 |
Deck replacement |
COMPLETE. Cost: $59,287. Funding:
BCEO FA
Photo:
Construction - removing old deck |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
DARRTOWN RD - Stillwell Beckett Rd to
Nichols Rd |
Resurfacing |
COMPLETE. Funding: Han Twp |
|
GREEN ACRES CT - Greenlea Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Han Twp |
|
GREENLEA DR - Ohio 129 to dead end |
Resurfacing |
COMPLETE. Funding: Han Twp |
|
HANOVER TWP PARK - Morman Rd |
Pave parking lot and
hike path |
COMPLETE. Funding: Han Twp |
|
MERLE AV - Vanda Av to Stahlheber
Rd |
Resurfacing |
COMPLETE. Funding: Han Twp |
|
OHIO 129 - culvert two miles west
of Millville corp line |
Replacement |
COMPLETE. ODOT project. |
|
OHIO 177 - at Nichols Rd |
Culvert replacement
& improvements to intersection |
COMPLETE. ODOT project. |
|
STILLWELL RD Bridge #03.315 |
Replacement |
COMPLETE. Est cost: $425,000. Funding:
BCEO. To be built as Design-Build.
Photo:
Old bridge - top view
Photo:
Old bridge - side view
Photo:
Construction - view east
Photo:
Construction - side view
Photo:
Construction - view west
Photo:
Complete - top view west
Photo:
Complete - top view east
Photo:
Complete - side view
Photo:
Complete - side view
Photo:
Complete - underside view |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
None |
|
|
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
CINCINNATI DAYTON
RD - Cimmeron
Dr to Millikin Rd |
Roadway improvement
- widen to 3 lanes, new storm sewer system |
Under construction eff
May 2. Completion: summer 07. Cost: $4,252,476. Funding: Federal
LPA, BCEO
News release.
Photo: Old roadway
Photo: Old
roadway
Photo: Old
roadway through Bethany
Photo: Old
roadway through Bethany
Photo: Old
roadway through Bethany
Photo: Old
roadway through Bethany
Photo: Construction
- view south from Millikin Rd
Photo: Construction
- view south from Millikin Rd
Photo: Construction
- view north from Princeton Rd
Photo: Construction
- view north from Princeton Rd
Photo: Construction
- view north from Princeton Rd
Photo: Construction
- view north from Bethany Rd |
|
CINCINNATI DAYTON
RD at CEDARCREST DR |
Turn lane addition |
COMPLETE. Funding: pvt, assessment |
|
CINCINNATI DAYTON
RD at KYLES STATION RD |
Signalization |
COMPLETE. Est cost: $75,000. Funding:
BCEO
Photo:
Before - view south
Photo:
New signals - view west |
|
EDAM CT - Wooden Shoe Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
GRETEL CT - Tulip Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
HAMILTON MASON RD
at LIBERTY FAIRFIELD RD |
Signalization |
COMPLETE. Est cost: $75,000. Funding:
BCEO
Photo:
New signals - view east
Photo:
Advance warning signs - view west |
|
HANSBRINKER CT - Hansbrinker Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
HANSBRINKER DR - Tulip Ln to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
KYLES STATION RD at N&S RR underpass |
Repairs to underpass
walls |
Under construction eff
Nov 27. Completion: Feb 07. Funding: N&S |
|
LIBERTY FAIRFIELD
RD - Ohio
4 to Great Miami River bridge |
Resurfacing |
COMPLETE. Est cost: $92,000. Funding:
BCEO |
|
LIBERTY WOODS CT - Liberty Woods Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
LIBERTY WOODS DR - Kyles Station Rd to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
MARKEN CT - Hansbrinker Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
MAUDS HUGHES RD - N&S RR bridge to Millikin
Rd |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
MILLIKIN RD Bridge #08.109 |
Replacement (replace
bridge w/ culvert) |
COMPLETE. Cost: $99,734. Funding:
BCEO FA
Photo:
Old bridge - top view
Photo:
Old bridge - side view
Photo:
Construction
Photo:
Construction
Photo:
Construction
Photo:
Construction
Photo:
Complete - top view
Photo:
Complete - side, inlet
Photo:
Complete - side, outlet |
|
PRINCETON RD at LESOURDSVILLE
WEST CHESTER RD |
Intersection improvement
- turn lanes, signalization, improve roadway to east and south
of intersection |
COMPLETE. Cost: $686,075. Signal cost:
$98,900. Funding: BCEO, Federal LPA (signal portion only)
Photo:
Before - view north
Photo:
Before - view east
Photo:
Construction nearing completion - view north
Photo:
Construction nearing completion - view west |
|
SILVER SKATE DR - Hansbrinker Dr to Cobblers
Tr |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
TULIP CT - Silver Skate Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
TULIP LN - Silver Skate Dr to Hansbrinker
Dr |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
WOODEN SHOE CT - Wooden Shoe Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
WOODEN SHOE DR - Hansbrinker Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: Lib Twp |
|
YANKEE RD at CINCINNATI
DAYTON RD
- Phase 2 |
Yankee Extension Project,
Phase 2. Roadway improvements - lane addition to Cin Day, widen
Yankee Rd to 5 lanes west of Cin Day tapering to 3 lanes approaching
Dutchland, new and upgraded signals |
COMPLETE. Project in conjunction w/
shopping development. Begun in 2005. Completed 2006. Cost: $1,689,035.
Funding: Butler County TIF
Photo: Construction
- Cin Day lane addition, view north
Photo: Construction
- Cin Day lane addition, view south
Photo: Construction
- Cin Day lane addition, view south
Photo: Construction
- Yankee Rd widening, view west
Photo: Construction
- Yankee Rd widening, view west
Photo: Construction
- new Liberty One Dr at Cin Day Rd
Photo: Nearing
completion - Cin Day Rd - view north toward Yankee
Photo: Complete
- Yankee Rd, view west |
|
YANKEE RD at CINCINNATI
DAYTON RD
- Phase 3 |
Yankee Extension Project,
Phase 3. Construction of new streets in conjunction w/ new hospital
complex and Lakota East HS |
COMPLETE. Cost: $1,849,413. Funding:
Butler County TIF
Photo: Construction
- new Lakota Ln skirts Lakota East HS parking lot
Photo: Construction
- new Liberty One Dr east of Lakota Ln |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
CEDAR GLEN WAY - Cloister Cliffs Dr to
dead end |
Resurfacing |
COMPLETE. Funding: Mad Twp |
|
CLOISTER CLIFFS DR - Thomas Rd to Sloebig Rd |
Resurfacing |
COMPLETE. Funding: Mad Twp |
|
ECK RD - Mosiman Rd to Howe Rd |
Resurfacing |
COMPLETE. Funding: Mad Twp |
|
ELK CREEK RD Culvert #01.382 |
Replacement |
COMPLETE. Cost: $8,713. Funding: BCEO
FA |
|
ELK CREEK RD Culvert #03.854 |
Replacement |
COMPLETE. Cost: $11,333. Funding:
BCEO FA
Photo:
New culvert |
|
ELK CREEK RD - Howe Rd to Ohio 122 |
Resurfacing |
COMPLETE. Est cost: $203,000. Funding:
BCEO |
|
HETZLER RD - Michael Rd to Hinkle Rd |
Resurfacing |
COMPLETE. Funding: Mad Twp |
|
OAKCROFT CIR - Cloister Cliffs Dr to
dead end |
Resurfacing |
COMPLETE. unding: Mad Twp |
|
WOODSDALE RD Culvert #01.336 |
Replacement |
COMPLETE. Cost: $14,531. Funding:
BCEO FA
Photo:
Old culvert - top view
Photo:
Old culvert - side view
Photo:
New culvert |
|
WOODSDALE RD Culvert #01.630 |
Replacement |
COMPLETE. Cost: $4,232. Funding: BCEO
FA |
|
WOODSDALE RD Culvert #02.011 |
Replacement |
COMPLETE. Cost: $4,549. Funding: BCEO
FA |
|
WOODSDALE RD - Wayne Madison Rd to Trenton
corp |
Resurfacing |
COMPLETE. Est cost: $305,000. Funding:
BCEO |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
HARRIS RD - east of Ohio 177 to Hamilton
Eaton Rd |
Resurfacing |
COMPLETE. Funding: Mil Twp |
|
MILFORD TWP COMMUNITY
CENTER -
parking lot |
Resurfacing |
COMPLETE. Funding: state CDBG |
|
OXFORD MILFORD RD - Ohio 73 to Harris Rd |
Resurfacing |
COMPLETE. Funding: Oxf Twp |
|
SOMERVILLE RD Culvert #02.636 |
Replacement |
COMPLETE. Cost: $22,720. Funding:
BCEO FA
Photo:
Old culvert - top view
Photo:
Old culvert - side view |
|
SOMERVILLE RD Culvert #02.834 |
Replacement |
COMPLETE. Cost: $15,740. Funding:
BCEO FA
Photo:
Old culvert - top view
Photo:
Old culvert - side view
Photo:
New culvert - inlet side
Photo:
New culvert - outlet side |
|
SOMERVILLE RD - Ohio 732 (Oxf Twp) to
Ohio 177 |
Resurfacing |
COMPLETE. Est cost: $296,000. Funding:
BCEO |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
ALERT NEW LONDON
RD Bridge
#04.418 |
Replacement |
COMPLETE. Est cost: $95,000. Funding:
BCEO FA
Photo:
Old bridge - top view
Photo:
Old bridge - side view
Photo:
Construction - tearing out old bridge
Photo:
Construction - setting beams
Photo:
Construction - setting beams |
|
BELL RD - Jenkins Rd to Layhigh Rd |
Resurfacing |
COMPLETE. Funding: Mor Twp |
|
CHAPEL RD Culvert #03.985 |
Replacement |
COMPLETE. Cost: $25,776. Funding:
BCEO FA
Photo:
Old culvert - top view and inlet channel
Photo:
Old culvert - side view
Photo:
New culvert |
|
CHAPEL RD Culvert #04.152 |
Repairs |
COMPLETE. Cost: $1,630. Funding: BCEO
FA |
|
CHAPEL RD Culvert #04.418 |
Replacement |
COMPLETE. Cost: $22,893. Funding:
BCEO FA
Photo:
Old culvert - top view
Photo:
Old culvert - side view
Photo:
Outlet channel
Photo:
New culvert - outlet
Photo:
New culvert - catch basin |
|
CHAPEL RD - Jenkins Rd to Ohio 129 |
Resurfacing |
COMPLETE. Est cost: $137,000. Funding:
BCEO |
|
LAYHIGH RD - I&E RR to North Wynn
Rd |
Resurfacing |
COMPLETE. Funding: Mor Twp |
|
NEW HAVEN RD Culvert #00.850 |
Replacement |
COMPLETE. Cost: $5,528. Funding: BCEO |
|
NEW HAVEN RD - Ohio 126 to Hamilton Co
line |
Resurfacing |
COMPLETE. Funding: BCEO |
|
SCHOENLING RD - California Rd to Indiana
state line |
Resurfacing |
COMPLETE. Funding: Mor Twp |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
OHIO 732 Bridge over Four Mile Creek |
Replacement |
COMPLETE. ODOT project. |
|
OHIO 732 culvert near Hueston Woods |
Replacement |
COMPLETE. ODOT project. |
|
OXFORD MILFORD RD
- Ohio 73
to Harris Rd |
Resurfacing |
COMPLETE. Funding: Oxf Twp |
|
RINGWOOD RD at CSX Railroad |
Crossing replacement |
COMPLETE. Funding: CSX
Photo: Crossing
before replacement
Photo: Crossing
before replacement
Photo: Crossing
before replacement
Photo: Crossing
after replacement
Photo: Crossing
after replacement |
|
SOMERVILLE RD - Ohio 732 to Ohio 177 (Mil
Twp) |
Resurfacing |
COMPLETE. Est cost: $296,000. Funding:
BCEO |
|
STOUT RD at CSX Railroad |
Crossing repairs |
COMPLETE. Funding: CSX
Photo: Crossing
before repairs
Photo: Crossing
before repairs
Photo: Crossing
before repairs
Photo: Crossing
after repairs |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
HARLEY RD - Stephenson Rd to Stillwell
Beckett Rd |
Resurfacing |
COMPLETE. Funding: Rly Twp |
|
INDIAN CREEK RD Bridge #01.360 |
Deck repairs |
COMPLETE. Funding: BCEO FA |
|
NICHOLS RD - North Law Rd to Hanover
Twp line |
Resurfacing |
COMPLETE. Funding: Rly Twp |
|
NORTH LAW RD Culvert #00.589 |
Replacement |
COMPLETE. Cost: $10,874. Funding:
BCEO FA. |
|
NORTH LAW RD Culvert #00.696 |
Replacement |
COMPLETE. Cost: $11,634. Funding:
BCEO FA. |
|
OHIO 732 Bridge over Little Indian
Creek |
Replacement |
COMPLETE. ODOT project. |
|
STILLWELL BECKETT
RD at WOODS STATION & NORTH PIERSON RD |
Intersection improvement |
COMPLETE. Cost: $575,508. Funding:
State OPWC, BCEO.
News release.
Image:
View project plan overlay on aerial photo
Photo:
Construction - view west
Photo:
Construction - view west
Photo:
Construction - view west
Photo:
Construction - old road
Photo:
Construction - view east
Photo:
Construction - view east
Photo:
Construction - view east
Photo:
Complete - view west
Photo:
Complete - view west
Photo:
Complete - view east
Photo:
Complete - view east
Photo:
Complete - Woods Stn Rd new approach to Stillwell Beckett |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
BLACK RD - Hamilton New London Rd
to Ross Hanover Rd |
Pavement repairs |
COMPLETE. Funding: Ros Twp |
|
HAMILTON NEW LONDON
RD Culvert
#02.378 |
Replacement |
COMPLETE. Est cost: $20,000. Funding:
BCEO FA
Photo:
Old culvert - top view
Photo:
Old culvert - side view
Photo:
Outlet channel |
|
HAMILTON NEW LONDON
RD - U.S.
27 to Hamilton corp |
Resurfacing |
COMPLETE. Cost: $7,566. Funding: BCEO |
|
HINE RD - Smith Rd to Ohio 128 |
Resurfacing |
COMPLETE. Funding: Ros Twp |
|
KIRCHLING RD - Ohio 748 to U.S. 27 |
Resurfacing |
COMPLETE. Funding: Ros Twp |
|
KRAUS LN - Ohio 128 to dead end |
Resurfacing |
COMPLETE. Funding: Ros Twp |
|
OHIO 129 - culvert two miles west
of Millville corp line |
Replacement |
COMPLETE. ODOT project. |
|
SKY MEADOW DR culverts |
2 culvert replacements |
COMPLETE.
Cost: $88,680.
Structure funding: Ross Twp, St Clair Twp. Construction: BCEO
FA
Photo:
Clv #00.354 - old - side view
Photo:
Clv #00.354 - new - top view
Photo:
Clv #00.354 - new - inlet
Photo:
Clv #00.392 - old - top view
Photo:
Clv #0.392 - old - side view
Photo:
Clv #0.392 - construction
Photo:
Clv #0.392 - construction
Photo:
Clv #0.392 - construction
Photo:
Clv #0.392 - construction and temp road
Photo:
Clv #0.392 - new - top view
Photo:
Clv #0.392 - new - side inlet view
Photo:
Clv #0.392 - new - side outlet view |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
AUGSPURGER RD at CSX Railroad |
Crossing replacement |
COMPLETE. Funding: CSX |
|
EATON RD - North of Brooks Rd |
Ditch realignement and
roadway safety improvement |
COMPLETE. Cost: $137,095. Funding:
BCEO
Photo: Sharp drop-off
- view south
Photo: Another
view south - embankment and guardrail slippage
Photo: Guardrail
slippage
Photo: Complete
- view south
Photo: Complete
- view north |
|
HAMILTON TRENTON
RD at N&S
Railroad |
Crossing replacement |
COMPLETE. Funding: N&S |
|
JACKSON RD at CSX Railroad (south crossing) |
Crossing repairs |
COMPLETE. Funding: CSX |
|
JACKSON RD at CSX Railroad (north crossing) |
Crossing replacement |
COMPLETE. Funding: CSX |
|
RIVERSIDE DR - Caldwell St to Trenton
Rd |
Resurfacing |
COMPLETE. Est cost: $63,000. Funding:
BCEO |
|
SKY MEADOW DR culverts |
2 culvert replacements |
COMPLETE. Cost: $88,680. Structure
funding: Ross Twp, St Clair Twp. Construction: BCEO FA
Photo:
Clv #00.354 - old - side view
Photo:
Clv #00.354 - new - top view
Photo:
Clv #00.354 - new - inlet
Photo:
Clv #00.392 - old - top view
Photo:
Clv #0.392 - old - side view
Photo:
Clv #0.392 - construction
Photo:
Clv #0.392 - construction
Photo:
Clv #0.392 - construction
Photo:
Clv #0.392 - construction and temp road
Photo:
Clv #0.392 - new - top view
Photo:
Clv #0.392 - new - side inlet view
Photo:
Clv #0.392 - new - side outlet view |
|
SEVEN MILE, VILLAGE
OF - Ritter
St |
Sidewalk replacement |
COMPLETE. Est cost: $50,000. Funding:
State CDBG |
|
TAYLOR SCHOOL RD - Seven Mile corp to Jacksonburg
Rd |
Resurfacing |
COMPLETE. Est cost: $147,000. Funding:
BCEO |
|
U.S. 127 - in front of New Miami
school |
Sidewalk replacement |
COMPLETE. Est cost: $50,000. Funding:
State CDBG |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
HOWE RD - Jacksonburg Rd to wayne
Madison Rd |
Resurfacing |
COMPLETE. Funding: Way Twp |
|
SEVEN MILE, VILLAGE
OF - Ritter
St |
Sidewalk replacement |
COMPLETE. Est cost: $50,000. Funding:
State CDBG |
|
TAYLOR SCHOOL RD - Seven Mile corp to Jacksonburg
Rd |
Resurfacing |
COMPLETE. Est cost: $147,000. Funding:
BCEO |
|
TOLBERT RD - Wayne Milford Rd to Ohio
503 |
Resurfacing |
COMPLETE. Funding: Way Twp |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
ALLEN RD at RIVER
WALK DR (new) |
Turn lanes on Allen
Rd |
COMPLETE. Funding: WC Twp TIF |
|
BECKETT RD at MILL
CREEK DR |
Turn lane addition |
COMPLETE. Funding: BCEO
Photo:
Complete - view south
Photo:
Complete - view from Mill Creek Dr |
|
BECKETT RIDGE BLVD - Beckett Rd to Deer Path |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
BLUEBIRD DR - Barret Rd to Bluebird
Ct |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
CASCARA DR - Revere Run to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
CENTRE POINTE |
Construction of streets
and lake in conjunction w/ new park, addition of roundabout,
sanitary sewer construction |
COMPLETE. Cost: $1,453,313. Funding:
WC Twp TIF
Photo: Construction
- view west toward new roundabout
Photo: Construction
- view at new roundabout
Photo: Construction
- view west toward new roundabout
Photo: Construction
- view south from new roundabout
Photo: Construction
- new lake for park
Photo: Construction
nearly complete - new lake for park |
|
CHARLEMONT CT - Rolling Meadows to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
CHARTER OAK CT - Cox Rd to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
CINCINNATI DAYTON
RD - Mauds
Hughes Rd to Eagles Wing Dr |
Resurfacing |
COMPLETE. Est cost: $33,000. Funding:
BCEO |
|
COACHMAN DR - Monticello Dr to Shenandoah
Ct |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
COMMANCHE DR - Glenn Moor Dr to curb |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
DIMMICK RD - Cin Day Rd to Windwood
Dr |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
DIMMICK RD at N&S Railroad |
Crossing replacement |
COMPLETE. Funding: N&S |
|
FENCE ROW - Butterfly Wy to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
FIRE PL - Butterfly Wy to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
HADLEY DR - Jerry Dr to Kircaldy Dr |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
HAMILTON MASON RD
at LIBERTY FAIRFIELD RD |
Signalization |
COMPLETE. Est cost: $75,000. Funding:
BCEO
Photo:
New signals - view east
Photo:
Advance warning signs - view west |
|
KIRCALDY DR - Hadley Dr to Inverary
Ct |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
LAKE LAKOTA CR - Lakeridge Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
LAKE SPRING CT - Lake Lakota Cr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
LAKEPARK DR - Lakeshore Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
LAKERIDGE DR - Lakepark Dr to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
MUHLHAUSER RD at
ALLEN RD |
Intersection improvement
- add turn lanes, upgrade signals |
COMPLETE. Cost: $509,292. Funding:
Ohio Dept. of Development thru WC Twp
Photo:
Before - view SE down Allen
Photo:
Construction - view SE down Allen
Photo:
Construction - view SE down Allen
Photo:
Construction - view NW up Allen
Photo:
Construction nearly complete - view NW up Allen |
|
NORDAN DR - Cascara Dr to sidewalk
area |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
OREGON PASS - #6484 to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
PULLMAN CT - Oregon Pass to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
QUIET TIME PL - Fence Row to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
RED CEDAR LN - Revere Run to cul-de-sac |
Resurfacing |
COMPLETE. Funding: WC Twp |
|
RIALTO RD at N&S Railroad |
C | | |