- Completed
Projects - 2009
-
- 2009 Projects by Township
|
Updated:
March 17, 2010
Select
a township by clicking on the map below.
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
Various County and
township roads |
Centerline and edgeline
restriping / retracing |
COMPLETE. Cost: $240,103. Funding:
BCEO & twps |
|
Various County-maintained
intersections |
Installation of UPS
battery backup for traffic signals |
COMPLETE. Cost: $95,995. Funding:
BCEO |
|
Various County roads |
Ditching / mowing /
weed spraying |
Seasonal, ongoing maintenance.
Funding: BCEO FA |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
LIBERTY FAIRFIELD
RD Bridge
#03.803 (over Great Miami River) |
Replacement and roadway
realignment |
COMPLETE. Cost: $10,312,716. Funding:
Federal, State, BCEO
News release - ground breaking.
News
release - ribbon cutting.
Image:
View project plan overlay on aerial photo
Photos: Click
for Lib Ffd Rd Bridge photos page |
|
MORRIS RD culvert near Alexis Dr |
Removal |
COMPLETE. Cost: $6,805. Funding: BCEO
FA (labor) |
|
MORRIS RD - Ham Mason Rd to Ffd North
Elem |
Resurfacing |
COMPLETE. 0.7 mile. Cost: $59,534.
Funding: Ffd Twp |
|
RENTSCHLER FOREST
PRESERVE & MIAMI-ERIE CANAL METROPARK |
Storm erosion damage
repairs |
COMPLETE. Cost: $18,830. Funding:
BCEO FA (labor), BC MetroParks (materials) |
|
RIVER RD Bridge #00.722 |
Replacement |
COMPLETE. Cost: $534,612. Funding:
State OPWC, BCEO, City of Ffd
News release.
Photo:
Old bridge - top view
Photo:
Old bridge - side view
Photo:
Construction - top view
Photo:
Construction - top view |
|
RIVER RD - Ham Co line to Ffd corp
& Ffd corp to Lake Circle Dr |
Resurfacing, install
raised pavement markers |
COMPLETE. 1.1
miles. Cost: $270,541. Funding: Fed
- American Recovery & Reinvestment Act (stimulus) |
|
TULEY RD - Alston Av to Tylersville
Rd |
Resurfacing |
COMPLETE. 0.7
mile. Cost: $76,870. Funding: Ffd Twp |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
DARRTOWN RD - Nichols Rd to Milford
Twp line |
Resurfacing |
COMPLETE. 0.5 mile. Cost: $56,298.
Funding: Han Twp |
|
DARRTOWN RD - Ohio 130 to dead end |
Resurfacing |
COMPLETE. 1.0 mile. Cost: $79,334.
Funding: Han Twp |
|
DECAMP RD - Stillwell Beckett Rd to
south 1,820 ft |
Resurfacing (SAMI seal) |
COMPLETE. 0.7 mile. Cost: $23,248.
Funding: Han Twp |
|
GARDNER RD - Hamilton corp to Beissinger
Rd |
Resurfacing |
COMPLETE. 0.5 mile. Cost: $65,549.
Funding: Han Twp |
|
HOGUE RD - Ohio 177 to St. Clair
Twp line |
Resurfacing (SAMI seal) |
COMPLETE. 1.9 miles. Cost: $52,336.
Funding: Han Twp |
|
LANES MILL RD Culvert #02.089 |
Replacement |
COMPLETE. Cost: $40,193. Funding:
BCEO FA
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side
Photo:
New culvert - top view
Photo:
New culvert - outlet side |
|
RAHFUSE AV - Pearle Ln to chip seal
section |
Resurfacing (SAMI seal) |
COMPLETE. 0.1 mile. Cost: $1,790.
Funding: Han Twp |
|
ROSS HANOVER RD - U.S. 27 to Millville village
line |
Resurfacing |
COMPLETE. 0.5 mile. Cost: $78,878.
Funding: State CDBG |
|
VIZEDOM RD - Ohio 177 to south 173
ft |
Resurfacing |
COMPLETE. 0.1 mile. Cost: $6,191.
Funding: Han Twp |
|
WASHBURN RD - Ohio 177 to pvt bridge |
Resurfacing (SAMI seal) |
COMPLETE. 0.2 mile. Cost: $5,842.
Funding: Han Twp |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
None |
|
|
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
CHABLIS DR - Moselle Dr to Mogul Ln |
Resurfacing |
COMPLETE. 0.3
mile. Cost: $37,413. Funding: Lib Twp |
|
DUTCHLAND PKWY near Liberty School |
Sidewalk installation |
COMPLETE. Cost:
$27,440. Funding: Fed LPA |
|
FORT LIBERTY PARK
- parking
lot |
Resurfacing |
COMPLETE. Cost:
$76,093. Funding: Lib Twp |
|
HAMILTON MASON RD
- Mauds Hughes
Rd to 1,230 ft east |
Resurfacing |
COMPLETE. 0.2
mile. Cost: $29,380. Funding: Lib Twp |
|
I-75 - Cincinnati Dayton Rd to
Middletown corp |
Widen to 4 lanes in
each direction, upgrade interchanges at Ohio 63 and Ohio 122 |
Under construction.
Completion: 2010. ODOT project. Cost: $98,824,590.
Complete project details. |
|
I-75 at OHIO 129
(Liberty Way Interchange) |
Expanded interchange
- distributor/collector road for new hwy access to Ham Mason
Rd and Cox Rd |
COMPLETE. TID project. Phase 3 of
Ohio 129 / I-75 interchange expansion (Liberty Interchange).
TID project in conjunction with ODOT, OKI, Lib Twp, WC Twp, BCEO.
New ramps to Ham Mason Rd (Lib Way) constructed in conjunction
w/ ODOT I-75 widening project. Cost: $14,742,859. Funding: But
Co, Lib Twp, WC Twp. Under construction eff mid-08. Completed:
Oct 09.
Schematic: New
ramps and roadway configurations.
Artist
sketch: Aerial sketch of new interchange |
|
IMPERIAL DR - Willow Brooke Dr to 1,500
ft east |
Resurfacing |
COMPLETE. 0.3
mile. Cost: $27,281. Funding: Lib Twp |
|
LIBERTY WAY at TYLERS
PLACE BLVD |
New signals |
COMPLETE. Full
operation Oct 15. |
|
LIBERTY WAY (formerly
HAM MASON RD) -
Cincinnati Dayton Rd to I-75 |
Roadway improvement
- widen to 5 lanes |
COMPLETE. TID project. Phase 4 of
Ohio 129 / I-75 interchange expansion (Liberty Interchange).
Cost: $3,901,099. Funding: BC TIF, Lib & WC Twp. Under construction.
Completed: Oct 09. |
|
LIBERTY FAIRFIELD
RD Bridge
#03.803 (over Great Miami River) |
Replacement and roadway
realignment |
COMPLETE. Cost: $10,312,716. Funding:
Federal, State, BCEO
News release - ground breaking.
News
release - ribbon cutting.
Image:
View project plan overlay on aerial photo
Photos: Click
for Lib Ffd Rd Bridge photos page |
|
LOGSDON'S WOODS DR
- at subdivision
entrance |
Resurfacing |
COMPLETE. Cost:
$3,337. Funding: Lib Twp |
|
MAUDS HUGHES RD - at Ham Mason Rd |
Guardrail repairs |
COMPLETE. Funding:
BCEO FA |
|
MILLIKIN RD between Snow Hill and 747 |
Ditching, berm repairs |
COMPLETE. Funding:
BCEO FA |
|
PROVIDENCE RIDGE
DR - Walnut
Creek Dr to 600 ft east |
Resurfacing |
COMPLETE. 0.1
mile. Cost: $15,092. Funding: Lib Twp |
|
WALNUT CREEK DR - Ham Mason Rd to 920 ft
north |
Resurfacing |
COMPLETE. 0.2
mile. Cost: $29,181. Funding: Lib Twp |
|
WHIPOORWILL WAY - Beech Knoll Ln to Moselle
Dr |
Resurfacing |
COMPLETE. 0.1
mile. Cost: $11,729. Funding: Lib Twp |
|
WILLOW BROOKE DR
- Princeton
Rd to 1,350 ft north |
Resurfacing |
COMPLETE. 0.3
mile. Cost: $33,581. Funding: Lib Twp |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
BERTHA AV - Keister Rd to dead end |
Resurfacing |
COMPLETE. 0.1
mile. Cost: $11,893. Funding: Mad Twp |
|
BEVERLY LN - Ohio 122 to cul-de-sac |
Resurfacing |
COMPLETE. 0.3
mile. Cost: $31,629. Funding: Mad Twp |
|
DAIRY LN - Trenton Franklin Rd to
dead end |
Resurfacing |
COMPLETE. 0.1
mile. Cost: $11,115. Funding: Mad Twp |
|
ELK CREEK RD - Ohio 122 to West Alexandria
Rd |
Resurfacing (SAMI seal) |
COMPLETE. 1.5
miles. Cost: $57,766. Funding: BCEO |
|
LIBERTY FAIRFIELD
RD Bridge
#03.803 (over Great Miami River) |
Replacement and roadway
realignment |
COMPLETE. Cost: $10,312,716. Funding:
Federal, State, BCEO
News release - ground breaking.
News
release - ribbon cutting.
Image:
View project plan overlay on aerial photo
Photos: Click
for Lib Ffd Rd Bridge photos page |
|
MAY AV - Ohio 122 to cul-de-sac |
Resurfacing |
COMPLETE. 0.2
mile. Cost: $17,787. Funding: Mad Twp |
|
WAYNE MADISON RD
at AUGSPURGER RD |
Install signals |
Start: Oct. Completion:
Jan 2010. Est cost: $100,000. Funding: BCEO |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
BAUER RD Bridge #02.048 |
Replace w/ box culvert |
COMPLETE. Cost: $260,019. Funding:
State OPWC, BCEO
Photo:
Old bridge - top view
Photo:
Old bridge - side view
Photo:
Construction - top view west
Photo:
Construction - top view west
Photo:
Construction - top view east
Photo:
Construction - inlet side
Photo:
Construction - outlet side
Photo:
New bridge - top view east
Photo:
New bridge - top view west
Photo:
New bridge - side view |
|
HAMILTON EATON RD north of State Rd |
Roadside slip repairs
(erosion from Seven Mile Creek) |
COMPLETE. Cost: $157,187. Funding:
BCEO (State OPWC 0-percent loan)
Photo:
Original stream bank erosion near road - view downstream
Photo:
Original stream bank erosion near road - view downstream
Photo:
Complete - view downstream
Photo:
Complete - view downstream
Photo:
Complete - view upstream
Photo:
Complete - view upstream |
|
HUSTON RD - Taylor School Rd to Scott
Rd |
Resurfacing (SAMI seal) |
COMPLETE. 1.0 mile. Cost: $29,879.
Funding: BCEO |
|
LANES MILL RD Culvert #02.476 |
Replacement, roadside
erosion repairs |
COMPLETE. Cost: $30,047. Funding:
BCEO FA
Photo:
New culvert - inlet side
Photo:
New culvert - outlet side
Photo:
Ditching, flow and erosion repairs |
|
LANES MILL RD Culvert #03.047 |
Replacement |
COMPLETE. Cost: $19,334. Funding:
BCEO FA
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side
Photo:
New culvert - inlet side
Photo:
New culvert - outlet side
Photo:
New guardrail at culvert site |
|
OXFORD MIDDLETOWN
RD - Oxford
Milford Rd to 0.9 mile east |
Resurfacing |
COMPLETE. 0.9 mile. Cost: $58,100.
Funding: Mil Twp |
|
SCOTT RD - Ohio 177 to Huston Rd |
Resurfacing (SAMI seal) |
COMPLETE. 2.8 miles. Cost: $96,666.
Funding: BCEO |
|
SOMERVILLE RD Bridge #05.345 (over Williams
Run) |
Replacement |
COMPLETE. Cost: $453,329. Funding:
State OPWC, BCEO
Photo:
Old bridge - top view
Photo:
Old bridge - side view
Photo:
New bridge - top/side view west
Photo:
New bridge - top view east
Photo:
New bridge - underside view |
|
STATE RD - Ham Eaton Rd to Ohio 744 |
Resurfacing (SAMI seal) |
COMPLETE. 2.7 miles. Cost: $95,665.
Funding: BCEO |
|
Township parking
lot |
Resurfacing |
COMPLETE. Cost: $37,091. Funding:
Mil Twp |
|
US 127 - Way Twp line to Preble
Co line |
Resurfacing, install
raised pavement markers |
COMPLETE. Funding:
Fed - American
Recovery & Reinvestment Act (stimulus) |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
ALERT NEW LONDON
RD - California
Rd to Schradin Rd |
Resurfacing |
COMPLETE. 1.3 miles. Cost: $89,137.
Funding: Mor Twp |
|
BUELL RD - Ohio 126 to dead end |
Resurfacing (SAMI seal) |
COMPLETE. 0.6 mile. Cost: $19,706.
Funding: Mor Twp |
|
CANN RD - Alert New London Rd to
dead end |
Resurfacing (SAMI seal) |
COMPLETE. 0.1 mile. Cost: $2,875.
Funding: Mor Twp |
|
HOWARD RD Bridge #01.640 (over Howard's
Creek) |
Replacement |
COMPLETE. Cost: $217,493. Funding:
State OPWC, BCEO
Photo:
Old bridge - top view
Photo:
Old bridge - side view
Photo:
Construction
Photo:
Construction
Photo:
Complete - top view west
Photo:
Complete - side view north
Photo:
Complete - side view south |
|
RACE LANE RD - short section near new
culverts |
Resurfacing |
COMPLETE. 0.1 mile. Cost: $3,800.
Funding: Mor Twp |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
BOOTH RD at CSX RR |
Crossing repair |
COMPLETE. Funding: CSX |
|
COLLEGE CORNER Village |
Ditching/drainage improvements |
COMPLETE. Cost: $48,932. Funding:
State CDBG |
|
TODD RD Culvert #00.241 |
Replacement |
COMPLETE. Cost: $18,037. Funding:
BCEO FA (labor), Oxf Twp (materials)
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
New culvert - inlet side
Photo:
New culvert - outlet side |
|
TODD RD Culvert #01.139 |
Replacement |
COMPLETE. Cost: $13,334. Funding:
BCEO FA (labor), Oxf Twp (materials)
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
New culvert - inlet side
Photo:
New culvert - outlet side |
|
TODD RD Culvert #01.257 & #01.261 |
Replacement (combine
into one culvert) |
COMPLETE. Cost: $18,826. Funding:
BCEO FA (labor), Oxf Twp (materials) |
|
TODD RD Culvert #01.473 |
Replacement |
COMPLETE. Cost: $4,886. Funding: BCEO
FA (labor), Oxf Twp (materials)
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side |
|
TODD RD Culvert #01.766 |
Replacement |
COMPLETE. Cost: $11,802. Funding:
BCEO FA (labor), Oxf Twp (materials)
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side
Photo:
New culvert - inlet side
Photo:
New culvert - outlet side |
|
TODD RD Culvert #02.689 |
Replacement |
COMPLETE. Cost: $8,953. Funding: BCEO
FA (labor), Oxf Twp (materials)
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side
Photo:
New culvert - inlet side |
|
TODD RD - Oxford city corp to Jones
Rd |
Resurfacing |
COMPLETE. 2.6 miles. Cost: $190,821.
Funding: Oxf Twp |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
BOOTH RD at CSX RR |
Crossing repair |
COMPLETE. Funding: CSX |
|
DECAMP RD - Stillwell Beckett Rd to
south 1,820 ft |
Resurfacing (SAMI seal) |
COMPLETE. 0.7 mile. Cost: $23,248.
Funding: Han Twp |
|
DUNWOODY RD Culvert #01.890 |
Replacement |
COMPLETE. Cost: $9,289. Funding: BCEO
FA (labor), Rly Twp (materials) |
|
GARNER RD Culvert #00.379 |
Replacement |
COMPLETE. Cost: $4,386. Funding: BCEO
FA
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side |
|
GARNER RD Culvert #00.850 |
Replacement |
COMPLETE. Cost: $11,325. Funding:
BCEO FA
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side |
|
GARNER RD Culvert #01.840 |
Replacement |
COMPLETE. Cost: $19,826. Funding:
BCEO FA
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side |
|
GARNER RD Culvert #01.885 |
Replacement |
COMPLETE. Cost: $26,860. Funding:
BCEO FA
Photo:
Old culvert - outlet side |
|
GARNER RD - Ohio 129 to Reily Millville
Rd |
Resurfacing (SAMI seal) |
COMPLETE. 2.4 miles. Cost: $106,979.
Funding: BCEO |
|
HART RD - Dunwoody Rd to Peoria
Reily Rd |
Resurfacing (strip patch
berms) |
COMPLETE. 1.7 miles. Cost: $15,920.
Funding: Rly Twp |
|
NORTH WEAVER RD - Dunwoody Rd to Peoria
Reily Rd |
Resurfacing (strip patch
berms) |
COMPLETE. 2.0 miles. Cost: $18,213.
Funding: Rly Twp |
|
NORTH WEAVER RD - Peoria Reily Rd to Springfield
Rd |
Resurfacing (SAMI seal) |
COMPLETE. 0.8 mile. Cost: $15,878.
Funding: Rly Twp |
|
REILY MILLVILLE RD - Ohio 732 to Bunker Hill
Woods Rd |
Resurfacing & installation
of raised pavement markers |
COMPLETE. 2.2 miles. Cost: $266,849.
Funding: BCEO |
|
STAHLHEBER RD - South Pierson Rd to Han
Twp line |
Resurfacing |
COMPLETE. 0.5 mile. Cost: $42,563.
Funding: Rly Twp |
|
STEPHENSON RD at CSX RR |
Crossing repair |
COMPLETE. Funding: CSX |
|
STILLWELL BECKETT
RD Culvert
#04.083 |
Replacement |
COMPLETE. Cost: $8,819. Funding: BCEO
FA
Photo:
Old culvert - top view, outlet side
Photo:
Old culvert - inlet side
Photo:
New culvert - top view, outlet side |
|
STILLWELL BECKETT
RD Culvert
#04.141 |
Replacement |
COMPLETE. Cost: $9,073. Funding: BCEO
FA
Photo:
Old culvert - top view, outlet side |
|
STILLWELL BECKETT
RD Culvert
#04.183 |
Replacement |
COMPLETE. Cost: $32,538. Funding:
BCEO FA
Photo:
Old culvert - top view, inlet side
Photo:
Old culvert - top view, outlet side
Photo:
Old culvert - outlet side
Photo:
New culvert - inlet side
Photo:
New culvert - outlet side |
|
STILLWELL BECKETT
RD at CSX
RR |
Crossing repair |
COMPLETE. Funding: CSX |
|
STILLWELL BECKETT
RD - Ohio
732 to Woods Stn Rd |
Resurfacing & installation
of raised pavement markers |
COMPLETE. 2.9 miles. Cost: $329,612.
Funding: BCEO |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
CINCINNATI BROOKVILLE
RD - Ham
Co line to Ohio 128 |
Resurfacing |
COMPLETE. 0.6 mile. Cost: $76,514.
Funding: BCEO |
|
JAY PHILLIP CT - Timberman Rd to dead end |
Resurfacing |
COMPLETE. 0.1 mile. Cost: $6,845.
Funding: Ros Twp |
|
ROBINA LN - Brown Farm Dr to dead
end |
Resurfacing (SAMI seal) |
COMPLETE. Cost: $4,823. Funding: Ros
Twp |
|
ROSS HANOVER RD - U.S. 27 to Millville village
line |
Resurfacing |
COMPLETE. 0.5 mile. Cost: $78,878.
Funding: State CDBG |
|
SORBUS DR - at Platanus Dr |
Resurfacing |
COMPLETE. 0.1 mile. Cost: $14,272.
Funding: Ros Twp |
|
TIMBERMAN RD - Smith Rd to Ham New London
Rd |
Resurfacing |
COMPLETE. 1.7 miles. Cost: $93,340.
Funding: Ros Twp |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
AUGSPURGER RD Culvert #02.161 |
Replacement |
COMPLETE. Cost: $6,616. Funding: BCEO
FA |
|
BEISSINGER RD - Eaton Rd to curves west |
Roadway improvements
- ease curves, replace culverts, improve drainage, improvements
to Eaton/Beissinger intersection |
COMPLETE. Cost: $602,644. Funding:
State OPWC, BCEO
Photo:
Previous curve
Photo:
Construction
Photo:
Complete - view west
Photo:
Complete - view west |
|
EATON RD Culvert #04.874 |
Replacement |
COMPLETE. Cost:
$8,069. Funding: BCEO FA |
|
EATON RD at BEISSINGER
RD |
See Beissinger Rd above |
COMPLETE
(intersection portion only). See
Beissinger Rd above |
|
LIBERTY FAIRFIELD
RD Bridge
#03.803 (over Great Miami River) |
Replacement and roadway
realignment |
COMPLETE. Cost: $10,312,716. Funding:
Federal, State, BCEO
News release - ground breaking.
News
release - ribbon cutting.
Image:
View project plan overlay on aerial photo
Photos: Click
for Lib Ffd Rd Bridge photos page |
|
SHARON PARK |
Catch basin replacements |
COMPLETE. Cost: $24,531. Funding:
State CDBG |
|
TRENTON RD at CSX RR |
Crossing repairs |
COMPLETE. Funding: CSX |
|
US 127 - Trenton Rd to Village of
Seven Mile |
Resurfacing, install
raised pavement markers |
COMPLETE. Funding:
Fed - American
Recovery & Reinvestment Act (stimulus) |
|
WAYNE MADISON RD
at AUGSPURGER RD |
Install signals |
Start: Oct. Completion:
Jan 2010. Est cost: $100,000. Funding: BCEO |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
JACKSONBURG RD Culvert #03.307 |
Replacement |
COMPLETE. Cost: $17,349. Funding:
BCEO FA
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side
Photo:
New culvert - outlet side |
|
JACKSONBURG RD Culvert #08.136 |
Replacement |
COMPLETE. Cost: $12,870. Funding:
BCEO FA
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side (left pipe) |
|
JACKSONBURG RD Culvert #08.148 |
Replacement |
COMPLETE. Cost: $12,870. Funding:
BCEO FA
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side (right pipe)
Photo:
New culvert - outlet side |
|
SHURZ RD - Ohio 744 to Stubbs Rd |
Resurfacing |
COMPLETE. 1.1 miles. Cost: $77,429.
Funding: Way Twp
Photo: Complete
near Stubbs |
|
US 127 - Village of Seven Mile to
Way Twp line |
Resurfacing, install
raised pavement markers |
COMPLETE. Funding:
Fed - American
Recovery & Reinvestment Act (stimulus) |
|
US 127 at N&S RR |
Crossing repairs |
COMPLETE. Funding:
N&S |
|
WAYNES TRACE RD Culvert #02.007 |
Replacement |
COMPLETE. Cost: $10,081. Funding:
BCEO FA
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side
Photo:
New culvert - outlet side |
|
WAYNES TRACE RD Culvert #03.676 |
Replacement |
COMPLETE. Cost: $8,462. Funding: BCEO
FA
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side
Photo:
New culvert - outlet side
Photo:
New culvert - outlet side |
|
WAYNES TRACE RD Culvert #03.788 |
Replacement |
COMPLETE. Cost: $7,241. Funding: BCEO
FA
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side
Photo:
New culvert - inlet side
Photo:
New culvert - outlet side |
|
WAYNES TRACE RD Culvert #05.597 |
Replacement |
COMPLETE. Cost: $9,958. Funding: BCEO
FA
Photo:
Old culvert - top view
Photo:
Old culvert - inlet side
Photo:
Old culvert - outlet side
Photo:
New culvert - inlet side
Photo:
New culvert - outlet side |
-
-
|
ROAD
/ LOCATION |
PROJECT |
NOTES |
|
BECKETT RD - Smith Rd to UCB |
Roadway improvements
- ease curve, add turn lanes at park, replace culvert, add bike
path |
COMPLETE.
Cost: $1,463,590.
Funding: WC Twp TIF
News release.
Video
Photo:
Original road - view SE at curve
Photo: Original
road - view SE
Photo: Original
road - view north
Photo:
Old culvert
Photo: Construction
- easing curve
Photo: Construction
- clearing for bike path along road
Photo: Construction
- new pavement laid at north curve
Photo: Construction
- new pavement at north curve
Photo: Construction
- new pavement, grading slope
Photo: Construction
- retaining wall
Photo: Construction
- top view of retaining wall
Photo: Construction
- top view of retaining wall
Photo: Construction
- view north toward south curve
Photo: Construction
- new pavement
Photo: Construction
- retaining wall nears completion
Photo: Construction
- completion at north curve
Photo: Construction
- widening, view south toward UCB |
|
CINCINNATI DAYTON
RD at DIMMICK RD and UCB |
Roadway improvements
- turn lane additions, signals, new streets for GE development |
COMPLETE. Est cost: $1,000,000. Funding:
private |
|
CRESCENTVILLE RD
at OHIO 747 |
Intersection improvement
- additional
turn lane |
COMPLETE. ODOT project. Est cost:
$3,120,000. Funding: Fed, BCEO, City of Springdale |
|
HAMILTON MASON RD
- Mauds Hughes
Rd to 1,230 ft east |
Resurfacing |
COMPLETE. 0.2
mile. Cost: $29,380. Funding: Lib Twp |
|
I-75 - Cincinnati Dayton Rd to
Middletown corp |
Widen to 4 lanes in
each direction, upgrade interchanges at Ohio 63 and Ohio 122 |
Under construction.
Completion: 2010. ODOT project. Cost: $98,824,590.
Complete project details. |
|
LIBERTY WAY (formerly
HAM MASON RD) -
Cincinnati Dayton Rd to I-75 |
Roadway improvement
- widen to 5 lanes |
COMPLETE. TID project. Phase 4 of
Ohio 129 / I-75 interchange expansion (Liberty Interchange).
Cost: $3,901,099. Funding: BC TIF, Lib & WC Twp. Under construction.
Completion: late 09. Some closures necessary. |
|
MAUDS HUGHES RD - at Ham Mason Rd |
Guardrail repairs |
COMPLETE. Funding:
BCEO FA |
|
OHIO 747 at N&S
RR |
Crossing repairs |
COMPLETE. Funding: N&S |
|
OHIO 747 at DEVITT
DR and INTERSTATE DR |
Install signals at
Devitt & 747. Construct connector road between dead-ends
of Devitt and Interstate Dr |
COMPLETE. ODOT project. Est cost:
$535,233. Funding: Federal |
|
PORT UNION RD near LeSaint Dr |
Westbound lane addition |
COMPLETE. Cost: $159,449. Funding:
State DOD, BCEO |
|
TYLERSVILLE RD Culvert #04.599 |
Replacement |
COMPLETE. Cost: $18,238. Funding:
BCEO FA |
|
TYLERSVILLE RD Culvert #04.628 |
Replacement |
COMPLETE. Cost: $4,606. Funding: BCEO
FA |
|
TYLERSVILLE RD Culvert #06.412 |
Replacement |
COMPLETE. Cost: $28,326. Funding:
BCEO FA |
|
TYLERSVILLE RD - Bypass 4 to Cox Rd |
Resurfacing, install
raised pavement markers |
COMPLETE. 6.0 miles. Cost: $1,810,541.
Funding: Fed - American Recovery & Reinvestment Act (stimulus) |
|
UNION CENTRE BLVD - West Chester Rd to Muhlhauser
Rd |
Roadway improvement
- add lane in each direction |
COMPLETE. Cost: $1,648,257. Funding:
WC Twp TIF
Photo: Roadway
before construction - view west |
|
UNION CENTRE BLVD
at FLOER DR |
Install new signals |
COMPLETE. Funding: WC Twp TIF |
|
UNION CENTRE BLVD
at IMAGINATION BLVD |
Install new signals
at new intersection |
Under construction.
Completion: Jan 2010. Cost: $271,583. Funding: WC Twp TIF |
|
Various township/subdivision
streets |
Resurfacing, slurry
seal, black matt |
COMPLETE. Est cost: $1,615,977. Funding:
WC Twp |
-
-