The Butler County Engineer's
Office will be modifying the submittal process for future engineering
services. A list of projects will be advertised approximately
every six months for consultants to submit a general request
for qualifications (additional RFQs may be advertised due to
unforeseen projects added during the 6-month period). This is
intended to reduce the time and burden for submitting a specific
RFQ by each consultant.
Engineering firms which
have been pre-qualified with the County Engineer's Office for
roadway, bridge or traffic engineering, which are interested
in being considered for contract to provide the required services,
should reply with a letter of interest no later than 4:30 p.m.
on January 20, 2006. Letters received after this time and date
will not be considered. Letters should be submitted to Gregory
J. Wilkens, P.E., P.S., Butler County Engineer, Attn: Ms. Annette
Peters, 1921 Fairgrove Avenue, Hamilton, Ohio 45011.
As required by Ohio
Revised Code 153.65-71, the responding firms will be evaluated
and ranked in order of their qualifications specifically for
each project. Letters of interest will be evaluated based on
the following criteria: background and experience on similar
projects, management and team credentials, experience of current
professional staff, proximity to project site, equipment and
facilities, availability to meet schedule, past performance for
the County Engineer (this includes a check for quality, ability
to meet deadlines and schedules, ability to control costs and
meet budget, and communication and cooperation). Since we have
your qualification statement on file, please include in your
letter of interest specific information relative to the above
criteria that will assist us in evaluating your firm for this
specific project. A project approach will not be needed for the
specific projects listed. Please include with the RFQ the projects
your firm is most interested in from the project list. If you
are not prequalified in a certain area which is required for
a project, list any subconsultants that you will be utilizing.
Following the evaluations, the Butler County Engineer's Office
will enter into contract negotiations with the most highly qualified
firm.
The preliminary project
descriptions are as follows:
Project 1: Three
Bridge Replacements
Description: Corso Road Bridge #00.123
(2005
Inspection Report)
Location: Oxford Township, Butler County, Ohio
Description: Bauer Road Bridge #00.807
(2005
Inspection Report)
Location: Milford Township, Butler County, Ohio
Description: Indian Creek Bridge #01.360
(2005
Inspection Report)
Location: Reily Township, Butler County, Ohio
Funding source: State OPWC, BCEO
Project schedule: (Project dates are subject to
change.)
Anticipated dates for design startup/completion:
3/01/06 - 8/01/06
Right-of-way acquisition startup/completion: 8/01/06
- 1/01/07
Anticipated dates for construction startup/completion:
3/01/07 - 9/1/07
Project 2: Two
Bridge Replacements
Description:
Layhigh
Road Bridge #06.954 (2005
Inspection Report)
Location: Ross Township, Butler County, Ohio
Description: Ross Hanover Road Bridge #01.298
(2005
Inspection Report)
Location: Ross / Hanover Townships, Butler County,
Ohio
Funding source: State OPWC, BCEO
Project schedule: (Project dates are subject to
change.)
Anticipated dates for design startup/completion:
3/01/06 - 8/01/06
Right-of-way acquisition startup/completion: 8/01/06
- 1/01/07
Anticipated dates for construction startup/completion:
3/01/07 - 9/1/07
Project 3: Two
Bridge Replacements
Description: Morgan Ross Road Bridge #01.016
(2005
Inspection Report)
Location: Morgan / Ross Townships, Butler County,
Ohio
Description:
LeSourdsville
West Chester Road Bridge #00.168 (2005
Inspection Report)
Location: West Chester Township, Butler County,
Ohio
Funding source: State OPWC, BCEO
Project schedule: (Project dates are subject to
change.)
Anticipated dates for design startup/completion:
3/01/06 - 8/01/06
Right-of-way acquisition startup/completion: 8/01/06
- 1/01/07
Anticipated dates for construction startup/completion:
3/01/07 - 9/1/07
Project 4: Cincinnati
Dayton Road at Linn Road Intersection Improvement
Description: Intersection improvement with
proposed turn lanes and traffic light
Location: Liberty Township, Butler County, Ohio
Funding source: Developer, Lakota Schools,
BCEO
Project schedule: (Project dates are subject to
change.)
Anticipated dates for design startup/completion:
3/01/06 - 9/01/06
Right-of-way acquisition startup/completion: 9/01/06
- 2/01/07
Anticipated dates for construction startup/completion:
3/01/07 - 7/1/07
Project 5: Hamilton
New London Bridge #05.029 Bridge Replacement
Description: Bridge replacement (2005
Inspection Report)
Location: Ross Township, Butler County, Ohio
Funding source: Federal LBR
Project schedule: (Project dates are subject to
change.)
Anticipated dates for design startup/completion:
6/01/06 - 6/01/07
Right-of-way acquisition startup/completion: 2010
Anticipated dates for construction startup/completion:
2011
Project 6: Princeton
Road at Gilmore Road Intersection Improvement
Description: Intersection improvement with
proposed traffic light and additional lanes added to Gilmore
Road (from SR 129 to Princeton Road) and Princeton Road (from
Walden Ponds Circle to Bypass 4). The extent and lane configuration
of the project is still to be determined.
Location: Fairfield Township, Butler County, Ohio
Funding source: Fairfield Township TIF
Project schedule: (Project dates are subject to
change.)
Anticipated dates for design startup/completion:
3/01/06 - 10/01/06
Right-of-way acquisition startup/completion: 10/01/06
- 2/01/07
Anticipated dates for construction startup/completion:
3/01/07 - 8/1/07
Project 7: Hamilton
Mason Road at Bypass 4 Intersection Improvement
Description:
Intersection
improvement with proposed traffic light with additional lanes
added to Hamilton Mason Road and Bypass 4. The extent and lane
configuration of the project is still to be determined.
Location: Fairfield Township, Butler County, Ohio
Funding source: Township TIF
Project schedule: (Project dates are subject to
change.)
Anticipated dates for design startup/completion:
3/01/06 - 10/01/06
Right-of-way acquisition startup/completion: 10/01/06
- 2/01/07
Anticipated dates for construction startup/completion:
3/01/07 - 8/1/07
Project 8: Tylersville
Road Widening
Description: An additional center lane
will be added from the Kohl's access drive (just east of Cox
Road) to Butler Warren Road.
Location: West Chester Township, Butler County,
Ohio
Funding source: State OPWC, BCEO
Project schedule: (Project dates are subject to
change.)
Anticipated dates for design startup/completion:
5/01/06 - 1/01/07
Right-of-way acquisition startup/completion: 1/01/07
- 1/01/08
Anticipated dates for construction startup/completion:
3/01/09 - 7/1/09
Project 9: Hamilton
Mason Road at Liberty Fairfield Road and Vinnedge Road Intersection
Improvement
Description: Relocate Liberty Fairfield
Road to align with Vinnedge at Hamilton Mason with a proposed
traffic light.
Location: Fairfield / Liberty / West Chester Townships,
Butler County, Ohio
Funding source: State OPWC, BCEO
Project schedule: (Project dates are subject to
change.)
Anticipated dates for design startup/completion:
5/01/06 - 1/01/07
Right-of-way acquisition startup/completion: 1/01/07
- 1/01/08
Anticipated dates for construction startup/completion:
1/01/08 - 6/1/08