* Public Announcement *
January 20, 2012
 
Request For Qualifications
 
Engineering Services - 2012
Projects: Bonham Road Bridge #00.388,
Tylersville Road Improvement from I-75 to Cox Road

Engineering firms which have been pre-qualified with the Butler County Engineer's Office which are interested in being considered for contract to provide the required services should reply with a letter of interest (one copy) no later than 4:30 p.m. on February 6, 2012. Letters received after this time and date will not be considered. Letters should be submitted to Gregory J. Wilkens, P.E., P.S., Butler County Engineer, Attn: Ms. Annette Peters, 1921 Fairgrove Avenue, Hamilton, Ohio 45011.

As required by Ohio Revised Code 153.65-71, the responding firms will be evaluated and ranked in order of their qualifications. Letters of interest will be evaluated based on the following criteria: background and experience on similar projects, management and team credentials, experience of current professional staff, proximity to project site, equipment and facilities, availability to meet schedule, past performance for the County Engineer (this includes a check for quality, ability to meet deadlines and schedules, ability to control costs and meet budget, and communication and cooperation). The length of the submittal shall not exceed ten pages (not including resumes). A project approach is not necessary for this submittal.

Following the submittal evaluations, the Butler County Engineer's Office will post on this web site the top three ranked firms and will enter into contract negotiations with the most highly qualified firm.

During the advertisement period, there will be no formal or informal meetings with the Butler County Engineer's Office regarding these projects. Any specific questions regarding the projects can be directed via email to the project manager.

Following is the list of projects:

 

PROJECT 1: Bonham Road Bridge #00.388 - Bridge Replacement

Location: Oxford Township, Butler County, Ohio

Description: The project includes the replacement of an existing truss bridge on Bonham Road over Four Mile Creek just northeast of the City of Oxford. (2011 Bridge Inspection Report.)

Funding Source: BCEO, Federal LBR

Project Manager: David Quimby (Email: quimbyd@bceo.org)

Project Schedule: (Project dates are subject to change.)
Anticipated dates for design startup/completion: 06/01/12 - 06/01/13
Anticipated dates for right-of-way acquisition startup/completion: 06/01/13 - 06/01/14
Anticipated dates for utility relocation startup/completion: 06/01/14 - 03/01/15
Anticipated dates for construction startup/completion:
03/01/15 - 10/01/15

 

PROJECT 2: Tylersville Road Improvement - I-75 to Cox Road

Location: West Chester Township, Butler County, Ohio

Description: This project will include surveying and design (no environmental). The project will be split into two phases.

Phase 1:
Adding an additional thru eastbound lane from the I-75 northbound off-ramp to Cox Road. The intersection of Kingsgate Way/Dudley Drive and Tylersville Road will also be improved including upgrades to the signal with mast arms (geotechnical will be needed).

Phase 2:
Adding an additional thru westbound lane from the Cox Road to the I-75 northbound on-ramp. Included with this phase will be improvements to the Tylersville Road interchange as specified in the Interchange Modification Study that is currently being developed internally by the Butler County Engineer's Office.

Funding Source: BCEO, local

Project Manager: Steve Hartke (Email: hartkes@bceo.org)

Project Schedule: (Project dates are subject to change.)

Phase 1:
Anticipated dates for design startup/completion: 06/01/12 - 06/01/13
Anticipated dates for right-of-way acquisition startup/completion: 03/01/13 - 09/01/13
Anticipated dates for utility relocation startup/completion: 09/01/13 - 03/01/14
Anticipated dates for construction startup/completion:
03/01/14 - 11/01/14

Phase 2:
The BCEO has started developing the Interchange Modification Study for this phase. After the IMS is complete, the schedule for Phase 2 will then be determined.


 