Upcoming Closures Recent Openings Traffic Advisories
|
- Last
updated: July 1, 2009
The
fine print:
All dates
are dependent upon favorable weather.
Detours are posted for all thru traffic during closures.
How detours are determined.
Local and emergency access to homes and businesses is
maintained at all times.
Emergency personnel, local government agencies, school
districts and post offices are notified of all closures. Media
are also notified; however, we cannot guarantee that the information
will be published or aired.
Current project information, status reports, and pictures...please
see Current Projects.
BCEO Butler County online
map.
- BECKETT ROAD
- West Chester Township
- Closed in various
stages between Union Centre Boulevard and Smith Road effective
June 15, 2009 for construction associated with a roadway improvement.
While the Beckett Road construction is in effect from May through
October, motorists will only encounter road closures between
June 15 and August 15. The closures will occur in three different
phases and will shift as work progresses. Throughout the course
of this project, local access will be maintained to residents
and businesses, although access will be limited to one side of
the main closure area depending upon one's location relative
to the phasing and work being performed. Detours will be posted
for all thru traffic. The phasing will be as follows:
-
- PHASE 1 -- Effective
June 15, 2009, Beckett Road is closed between Prairie Lake Boulevard
and Beckett Ridge Boulevard. Access to Prairie Lake Boulevard
will be from the south side only (Union Centre Boulevard). Access
to Beckett Ridge Boulevard will be from the Smith Road side only.
- PHASE 2 -- Beckett
Road will be closed between Beckett Ridge Boulevard and Smith
Road. Access to Beckett Ridge Boulevard and points south will
be from Union Centre Boulevard only.
- PHASE 3 -- Beckett
Road will be closed between Prairie Lake Boulevard and Union
Centre Boulevard. Access to Prairie Lake Boulevard and points
north will be from the Smith Road side only. Road to reopen by
August 15, 2009.
-
- Detour for all
phases: Northbound
Beckett Road traffic will detour west on Union Centre Boulevard,
north on Ohio 747, and east on Smith Road. Southbound traffic
will reverse this route.
- Map of closure phasings.
- News
release.
- Video.
-
-
- BUTLER WARREN ROAD
- Liberty Township
/ Warren County line
- Will close between
Millikin Road (Brewer Road, Warren County side) and Kyles Station
Road (Hamilton Road, Warren County side) for drainage construction
by the Warren County Engineer's Office. The closures will be
daily for one week during working hours, 8:00 a.m. 4:00
p.m. starting on Monday, July 6, 2009.
-
-
- HAMILTON MASON
ROAD
- Liberty / West
Chester Townships
- Traffic Advisory: Speed limit temporarily lowered
to 45 MPH in construction zone between Cincinnati Dayton Road
and I-75 overpass through October 31, 2009.
-
-
- HOWARD ROAD
- Morgan Township
/ Hamilton County line
- Will close ten feet
east of Howards Creek Road (Edgewood Road, Hamilton County side)
and 0.6 mile west of Race Lane Road (Oxford Road, Hamilton County
side) for a bridge replacement beginning Wednesday, July 8, 2009.
The road is tentatively scheduled to reopen the week of September
7, 2009.
- Detour: Eastbound Howard Road traffic
will detour north on Howards Creek Road, east on Alert New London
Road, and south on Race Lane Road. Westbound traffic will reverse
this route.
- Locate on map.
- Notice to local residents and businesses.
-
-
- INTERSTATE 75
- Liberty / West
Chester Townships
- Traffic Advisory: Motorists can expect periodic
lane closures through 2009 in conjunction with the I-75 widening
project and associated bridge work by the Ohio Department of
Transportation (ODOT). Many lane closures will occur during the
overnight hours; however, daytime lane closures are also possible.
Four overpasses in Butler County have been rebuilt as part of
the project and are now complete. All overpass closures were
in 2008. There are no overpass closures anticipated for 2009.
Update June 16, 2009 -- From 11 p.m. Wednesday,
June 17 until 5 a.m. Thursday, June 18, the eastbound State Route
129 ramp to southbound Interstate 75 will be closed.
- Southbound I-75 traffic
will be detoured to northbound I-75, returning to southbound
I-75 at the Monroe/SR 63 exit.
Note: This information provided by ODOT. The BCEO
is not responsible for its accuracy.
- Complete
I-75 widening project details.
-
-
- LANES MILL ROAD
- Hanover and Milford
Townships
- Will close between
Nichols Road and Shollenbarger Road for a series of three culvert
replacements beginning Monday, July 6, 2009. The first culvert
to be replaced is located 0.2 mile north of Nichols Road and
0.5 mile south of Wallace Road. Work will take approximately
three weeks after which crews will move to the second culvert,
located 0.5 mile north of Nichols Road and 0.2 mile south of
Wallace Road. This culvert job will also involve extensive berm
repairs and will take approximately ten days to complete. Crews
will then move to the third culvert which is 0.2 mile south of
Shollenbarger Road and 0.3 mile north of Wallace Road. All work
is tentatively scheduled for completion the week of August 17,
2009 at which time the road will reopen.
- Detour: Northbound Lanes Mill Road
traffic will detour east on Nichols Road, northwest on Ohio 177,
and west on Shollenbarger Road. Southbound traffic will reverse
this route.
- Locate on map.
- Notice to local residents and
businesses.
-
-
- MORRIS ROAD
- Fairfield Township
- Open effective July
1, 2009.
- Locate on map.
-
-
- RIVER ROAD
- Fairfield Township
/ City of Fairfield
- Closed on the east
side of Burns Road, or 1,000 feet northeast of Georgetown Road
and 1.0 mile southwest of Lake Circle Drive, for a bridge replacement
effective June 1, 2009. The road is tentatively scheduled to
reopen the week of September 28, 2009.
- Detour: Northeastbound River Road
traffic will detour south on U.S 27 into Hamilton County, east
on Kemper Road, north on U.S. 127 back into Butler County and
the City of Fairfield, and west on Nilles Road to River Road.
Southwestbound River Road traffic will reverse this route.
- Locate on map.
- News
release.
- Notice to local residents and businesses.
-
-
- SOUTH DWYER ROAD
- Morgan Township
- Closed 0.4 mile southeast
of California Road and 50 feet northwest of Chelsea Ridge Court
(or 1.0 mile northwest of Okeana Drewersburg Road) effective
June 29, 2009 for work associated with the natural gas pipeline
installation by Rockies Express Pipeline. The road is tentatively
scheduled to reopen by July 3, 2009.
- Detour: Southeastbound South Dwyer
Road traffic will detour south on California Road and east on
Okeana Drewersburg Road. Northwestbound traffic will reverse
this route.
- Locate on map.
-
-
- TYLERSVILLE ROAD
- West Chester Township
- Open between Seward
Road and Smith Road / Tylers Reserve Drive effective June 19,
2009.
- Locate on map.
-
-
- TYLERSVILLE ROAD
- West Chester Township
- Open between Beckett
Road and Running Deer Drive effective June 26, 2009.
- Locate on map.
-
-
- U.S. 27 (PATTERSON
AVENUE)
- City of Oxford
- Traffic Advisory: Two-lane resurfacing of U.S.
27 (Patterson Avenue) in the City of Oxford is scheduled to begin
Monday, July 6, 2009. Work, which will be performed from Chestnut
Street to High Street, will consist of milling existing asphalt
and repaving. Traffic will be maintained with a flagging operation.
Work will take approximately two weeks to complete.
- Note: This information provided
by ODOT. The BCEO is not responsible for its accuracy.
-
- WOODSDALE ROAD
- Madison Township
- Closed at Wayne Madison
Road effective October 6, 2008. This closure is in conjunction
with the Liberty Fairfield Road / Wayne Madison Road bridge project
over the Great Miami River.
- Detour: Motorists will utilize nearby
Augspurger Road east to access Woodsdale Road. Woodsdale Road
traffic will access Wayne Madison Road via Augspurger Road.
-
-